3 • Hardware installation
Model 4520 & 4110 Series Getting Started Guide
38
Installing the gateway router
Location and mounting requirements
The SmartNode router is intended to be placed on a desktop or similar sturdy, flat surface that offers easy
access to the cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you
should consider the need to access the unit for future upgrades and maintenance.
Installing the gateway router
SmartNode gateway router installation consists of the following:
•
Placing the device at the desired installation location (see section
“Mounting the gateway router”
on
page 38)
•
Installing the interface and power cables (see section
“Connecting cables”
on page 38)
When you finish installing the SmartNode, go to chapter 4,
“Getting started with the SmartNode”
on page 45.
Mounting the gateway router
Place the router on a desktop or similar sturdy, flat surface that offers easy access to the cables. The router
should be installed in a dry environment with sufficient space to allow air circulation for cooling.
Note
For proper ventilation, leave at least 2 inches (5 cm) to the left, right, front,
and rear of the SmartNode gateway router.
Connecting cables
Installing router cables takes place in the following order:
1. Installing the RJ-11 voice port (FXS) cable or cables (see “Installing an interface cable on the router’s FXS
and FXO interface ports”)
2. Installing the 10/100 Ethernet port cable or cables (see
“Installing the Ethernet cable”
on page 41)
3. Installing the power input (see
“Connecting to external power source”
on page 43)
Do not work on the system or connect or disconnect cables during periods of
lightning activity.
Summary of Contents for SmartNode 4520 Series
Page 6: ...Contents Model 4520 4110 Series Getting Started Guide 6...
Page 8: ...Compliance information Model 4520 4110 Series Getting Started Guide 8...
Page 14: ...1 General information Model 4520 4110 Series Getting Started Guide 14...
Page 26: ...2 Applications overview Model 4520 4110 Series Getting Started Guide 26...
Page 34: ...3 Hardware installation Model 4520 4110 Series Getting Started Guide 34...
Page 46: ...4 Getting started with the SmartNode Model 4520 4110 Series Getting Started Guide 46...
Page 53: ...53 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 55...
Page 54: ...5 LEDs status and monitoring Model 4520 4110 Series Getting Started Guide 54...
Page 58: ...5 LEDs status and monitoring Model 4520 4110 Series Getting Started Guide 58 Status LEDs...
Page 60: ...6 Contacting Patton for assistance Model 4520 4110 Series Getting Started Guide 60...
Page 64: ...A Specifications Model 4520 4110 Series Getting Started Guide 64...
Page 70: ...B Cabling Model 4520 4110 Series Getting Started Guide 70...
Page 76: ...C Port pin outs Model 4520 4110 Series Getting Started Guide 76...
Page 79: ...79 Appendix D SmartNode 4110 Series factory configuration Chapter contents Introduction 81...
Page 80: ...D SmartNode 4110 Series factory configuration Model 4520 4110 Series Getting Started Guide 80...
Page 83: ...83 Appendix E SmartNode 4520 Series factory configuration Chapter contents Introduction 85...
Page 84: ...E SmartNode 4520 Series factory configuration Model 4520 4110 Series Getting Started Guide 84...
Page 87: ...87 Appendix F Installation checklist Chapter contents Introduction 89...
Page 88: ...F Installation checklist Model 4520 4110 Series Getting Started Guide 88...
Page 90: ...F Installation checklist Model 4520 4110 Series Getting Started Guide 90 Introduction...