2 • Hardware installation
Model 3324 User Guide
26
Completing the hardware installation
Completing the hardware installation
This section verifies that the 3324 hardware is operational to the point where you can begin configuring the
software settings. Do the following:
1. Verify that the AC power cord used with your 3324 is compatible with local standards. If it is not, refer to
Chapter 6,
“Contacting Patton for assistance”
on page 69 to find out how to replace it with a compatible
power cord.
2. Connect the male end of the power cord to an appropriate power outlet.
3. Verify that the green POWER LED is lit. If the POWER LED is flashing green, refer to Chapter 5,
“Trou-
bleshooting”
on page 65.
Hardware installation is complete. Refer to Chapter 3,
“Configuring the 3324 for operation”
on page 27.
The Model 3324’s power supply automatically adjusts to accept
an input voltage from 100 to 240 VAC (50/60 Hz), 1.5A.
Verify that the proper voltage is present before plugging the
power cord into the receptacle. Failure to do so could result in
equipment damage.
Summary of Contents for 3324
Page 8: ...Compliance Information Model 3324 User Guide 8...
Page 74: ...A Specifications Model 3324 VDSL Carrier Class Aggregator Configuration Guide 74...
Page 77: ...77 Appendix B Cabling Chapter contents Introduction 78...
Page 80: ...B Cabling Model 3324 VDSL Carrier Class Aggregator Configuration Guide 80 Introduction...
Page 81: ...81 Appendix C VDSL Spectrum Chapter contents Introduction 82...
Page 83: ...83 Appendix D Example of VLAN Setting Chapter contents Introduction 84...