Pre-Operation Inspection and Calibration Verification
© PAT Rev. 8 05/19/03
191319_8.DOC
33
6.3
INSTALLATION OF ANTI TWO-BLOCK RETAINER IN LOCKING POSITION
Procedure (see Fig. 1 and 2):
1. Pull the cable out of the switch and bend back parallel to the boom and hold (1).
2. Slide the retainer from left side with its slot over the cable between the crimped stop and the switch (2).
Push it firmly straight onto the cable guide of the Anti Two-Block switch (3).
Fig. 1
:
Setting of Anti Two-Block
Retainer in Locking Position
Fig. 2
:
Retainer in Locking Position
3. Straighten the cable completely into the slot and release the cable (4).
4. Turn the flag of the retainer for best visibility for the operator (5).
6.4
REMOVAL AND STORAGE OF THE ANTI TWO-BLOCK RETAINER
Procedure (see Fig. 3 and 4):
1. Pull the cable out of the switch (1) and bend back parallel to the boom and hold (2).
2. Move the retainer down (3) and then left (4) to remove it from the Anti Two-Block switch. Release
the cable.
3. For storage slide the retainer from right side (5) over the Anti Two-Block switch until the clips (A)
lock into the holes (B).
Fig. 3:
Removal of the Anti Two-
Block
Retainer
Fig. 4:
Retainer in Storage Position
Summary of Contents for DS 350 / 1319 Graphic
Page 3: ......
Page 5: ......
Page 11: ...Operator s Manual DS 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 6 Fig 2 Operating Console...