Operator's Manual
DS 350 / 1319
© PAT Rev. 8 05/19/03
191319_8.DOC
12
The LMI programming procedure consists of the following steps:
•
Setting The Boom Configuration
•
Setting The Counterweight Configuration (Where Applicable)
•
Setting The Hoist Configuration
•
Setting The Outrigger Configuration
•
Setting The Reevings
•
Confirmation Of The Programming Procedure
For easy operation, the computer guides the operator through the procedure step by step. (interactive
operation)
Definition of the Displayed Symbols:
The following illustrations define the symbols appearing on the display during the setup procedure. Not
all symbols will be shown, depending on the crane type and the answers to the questions.
•
Select interactive configuration setup / special mode setup
Interactive Configuration Setup
Special Mode Setup
Note
:
Refer to manufacturer load
chart for special LMI operating code
•
(if selected special mode setup only)
Increase Selected Numeral
Decrease Selected Numeral
Select Next Numeral
Confirm Selected Operating
Code
•
Setting the boom configuration
Main Boom / Aux. Boom
Nose
Operation
Operation With Boom
Extensions
Rigging Mode Operation*
*
For Cranes With Rigging Mode
For
Outrigger Box Installation Only
Or
Summary of Contents for DS 350 / 1319 Graphic
Page 3: ......
Page 5: ......
Page 11: ...Operator s Manual DS 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 6 Fig 2 Operating Console...