10-S
TEP
I
NSTALLATION
I
NSTALLATION
O
VERVIEW
:
Before beginning installation of your HP2000, take time to inspect the unit and the desired area of installation. If you
believe you are missing a part, please consult the included checklist. Before you begin, perform an inspection of the
truck and installation area. Be sure that all batteries are fully charged and in good condition. We recommend that you
load test your battery bank prior to installation. Take your time to look over the area where you plan to install the
HP2000 and make necessary measurements to ensure proper installation. Make sure that you have at least 20.5” of
free frame rail space for power unit installation. Check to see that there is nothing behind the APU protruding more
than one inch. Also, make sure you have the necessary space available under the bunk for the evaporator unit and
cable pass through.
Before you get started,
un-package your new system and all components. Inspect all components to make sure they
were not damaged during shipping. Examine your truck thoroughly, both inside and out, to locate the best place to
mount the APU. The diesel engine, A/C components and electrical controls are all contained in the frame-mounted
power unit enclosure, which measures 22.8” in height, by 20.5” in width, by 24.4” in depth. It is important to
remember that the APU location should not interfere with the driver’s access to other vital areas or crowd any wires,
air lines or fuel lines that may be nearby. While installation may vary slightly depending upon the make and model of
the truck it is installed on, proper installation will always be critical in guaranteeing proper operation of the APU system
17 |
Page
Summary of Contents for HP2000 XTREME Series
Page 1: ......
Page 2: ...2 Page ...
Page 63: ...A C Components Diagram 63 Page ...
Page 64: ...Maintenance Components Diagram 64 Page ...
Page 67: ...67 Page ...
Page 68: ...68 Page ...