●
For one water-Y at a time:
o
Cut the coolant hose between the hose crimpers.
o
Install the water Y with a hose clamp on each
side.
o
Tighten the two hose clamps.
o
Install a worm gear hose clamp and connect the
APU coolant hose to the clamp.
o
Tighten the worm gear hose clamp.
●
Once this has been completed for both Y’s, check that
the hoses and clamps are tight, and then remove the
hose crimpers.
29 |
Page
Summary of Contents for HP2000 XTREME Series
Page 1: ......
Page 2: ...2 Page ...
Page 63: ...A C Components Diagram 63 Page ...
Page 64: ...Maintenance Components Diagram 64 Page ...
Page 67: ...67 Page ...
Page 68: ...68 Page ...