Bolt Kit Contents
4x M20x
500mm
Threaded bar (per gate)
8x M20 Bolts (per gate)
8x M20 Penny washers (per gate)
1x Resin fix tube
2x resin fix nozzles
4x M16x100
mm
anchor bolts (for either catch post or center stop)
Swing Gate
Bolt Down Procedure
1.
You need to prepare the ground to accept the
swing gate
tower. you should consult
the
issued CAD
drawings. Be sure to CAT scan any area before excavation
2.
The
re are 2 different ways the gates are installed depending on what you order. The gate is installed
i
n
2 steps if it is “cast-in”
where the first pour is set below the ground level and the gate is bolted down
then a second pour is done up to the ground level. Please note! if the gate is being installed in an area
with a high water table you need to ensure you have adequate drainage. I
f you have opted for a “bolt-
down” installation
then
it would just be 1 step where it is just bolted down to the plinth at ground level.
3.
the first pour
of concrete (mentioned above) this should be 700mm deep. When this has cured you
drill and chem fix
4
x M20
threaded bars
into the surface to line up with the fixing holes in the gate
tower
base plate, (these have a nut above
and below the tower base
plate for adjustment/alignment
purposes).
4.
The gate leaf & tower will be
lowered
(base plate first) onto the threaded bar. here it will secured and
leveled up in all
direction
s
ensuring that the tower sits up out of the hole to the correct (level) height.
This is a very
important step as when the
other gate is fitted. It will need to line up with the
secondary
leaf
or catch post depending on the order
. Please note that this is very important
as there is only a
MINIMAL adjustment once the gates
receive the second pour of concrete.
5.
Once
the gate has now been
lowered
onto the threaded bar and has been leveled
accordingly
the
duct
can be pushed through the hole in the gate tower
if it is cast in
.
If it is a bolt down then this would
be
through the center of the base plate.
6.
Once the duct has been fed through the duct hole the second pour can be made
(cast in only)
. You
must allow for ducting to link one tower to the other
or to the catch post
as you
have to have a
communication
s
cable to allow the Master/Slave function
and the photocells
.
Summary of Contents for PF9700
Page 13: ...Address Tel Email Web Engineers Sec on Not For End Users Control Panel Overview...
Page 20: ...Address Tel Email Web...
Page 21: ...Address Tel Email Web...
Page 22: ...Address Tel Email Web...
Page 23: ...Address Tel Email Web...
Page 24: ...Address Tel Email Web...
Page 25: ...Address Tel Email Web...
Page 26: ...Address Tel Email Web...
Page 27: ...Address Tel Email Web 24v From External PSU Switch to Drop Bolt...