EN
| User Manual
Transportation, installation and storage
12
AKM 1-8/D3
Secure the cardboard box or pallet on the lifting or forklift truck against sliding move-
ments.
Transport the adsorber to its installation site.
Remove the packaging of the adsorber.
AKM 1-4: Adsorber in a
cardboard box
Adsorber on transportation pallet
Note the weight of the Adsorber!
Depending on its size, the adsorber may weigh up to approx. 35 kg. Take this
into account with regard to the following work steps!
Carefully place the adsorber in an upright
position.
Place the adsorber at its installation site.
Anchor dryer to the fl oor
The upright stand profi les of the adsorber
are provided with pre-drilled anchorage
bores (see fi gure).
Use suitable attachment material to
anchor the adsorber to the fl oor.
In the case of vibrating fl oors place the
adsorber on suitable vibration dampers.
Bores on the stand profi les
Mount adsorber on the wall
The stand profi les can be rotated by 90° towards the rear side of the adsorber and secured in
this position (see arrow in above fi gure).
Remove the screws at the stand profi les. Rotate the stand profi les by 90° until the auxil-
iary holes for the securing screws are aligned with each other. Retighten the screws securing
the stand profi le.
Use suitable attachment material of suffi cient carrying force to anchor the adsorber to the
wall.
Summary of Contents for Zander AKM 1
Page 2: ......
Page 4: ...EN User Manual 2 AKM 1 8 D3...
Page 42: ...EN User Manual 40 AKM 1 8 D3...
Page 43: ......