T6TR VHF 50 W Transceiver
Page 3
Installation
Introduction
The procedures in this topic describe how to install a T6TR transceiver. The procedures necessary
during installation are listed in Table 1 and it is recommended that they be completed in the order shown.
Table 1 Installation Procedures
Procedure
Reference
1
Read and understand the warnings and cautions given on
2
Perform an initial inspection of the transceiver and fit the correct ac input fuse.
3
Setting the required antenna configuration.
3
Fit the transceiver into an equipment cabinet (if required).
4
Make external signal connections. See
to
to determine which
external connections are required for the particular configuration.
5
Connect the chassis stud to the cabinet or system earth.
6
Connect the antenna(s).
7
Connect the dc input supply (if required).
8
Connect the ac input supply (if required).
Summary of Contents for T6TR
Page 1: ...T6TR VHF 50 W Transceiver User Documentation ...
Page 10: ...Back to Transceiver Main Page Intentionally Blank ...
Page 24: ...Back to Transceiver Main Page Intentionally Blank ...
Page 66: ...Back to Transceiver Main Page Intentionally Blank ...
Page 98: ...Back to Transceiver Main Page Intentionally Blank ...
Page 130: ...Back to Transceiver Main Page Fig 9 Processor Module Removal and Refitting Detail PA CN 8 ...
Page 132: ...Back to Transceiver Main Page Fig 11 PA Control Rx RF Module Removal and Refitting Detail ...
Page 133: ...Back to Transceiver Main Page Fig 12 Power Supply Removal and Refitting Detail ...
Page 134: ...Back to Transceiver Main Page Fig 13 PA Module Removal and Refitting Detail ...
Page 136: ...Back to Transceiver Main Page Fig 15 Cooling Fan Removal and Refitting Detail ...