22
The pages in the following section of this manual should be copied and used when training staff to operate
the Paramount Spiral Mixer. It is recommended that the competency assessment checklists be completed,
signed, and a copy kept in the personnel files for future reference.
• Competency check lists are copied and completed as part of the training of staff.
• Correct training of staff to the required competency expectations.
• The verification section of the competency check list is signed off.
• A copy of the completed and signed competency check list is placed in personnel records as
evidence of operator competence.
Summary of Contents for SM2-25
Page 1: ...243483 1...
Page 22: ...20 400 415Vac 3PH PE...
Page 23: ...21 400 415Vac 3PH PE...
Page 27: ...25...
Page 28: ...26...
Page 29: ...27...
Page 30: ...28...
Page 31: ...29 Part No Part Name Part Code Specification...
Page 32: ...30 Part No Part Name Part Code Specification...
Page 33: ...31...
Page 34: ...32...
Page 35: ...33...
Page 36: ...34...
Page 39: ...37...
Page 40: ...38...
Page 41: ...39...
Page 42: ...40...
Page 45: ...43...
Page 46: ...44...
Page 47: ...45...
Page 48: ...46...
Page 51: ......