11. Maintenance and Services
1000-A2-GB22-10
11-16
June 2005
Step 4
Click
Status
. The Status tab appears (
Figure 11–9
).
Figure 11–9. Port Configuration—Status Tab
Step 5
Select
Lock
from the Administrative state drop-down list.
Step 6
Select
Near End Line Loop
from the Loopback Mode
drop-down list.
Step 7
Place the card to the Unlocked state when the test is completed.
Summary of Contents for Jetstream CPX-1000
Page 1: ...Jetstream JetCraft User s Guide Release 2 6 Document No 1000 A2 GB22 10 June 2005...
Page 6: ...E June 2005 1000 A2 GB22 10...
Page 42: ...3 JetCraft Basic Operations 1000 A2 GB22 10 3 10 June 2005...
Page 64: ...5 CPX 1000 Configuration 1000 A2 GB22 10 5 14 June 2005...
Page 77: ...June 2005 7 3 1000 A2 GB22 10 7 Interface Groups Figure 7 1 Interface Group Tabular View...
Page 162: ...9 IAD Profiles and IADs Provisioning 1000 A2 GB22 10 9 52 June 2005...
Page 182: ...10 Alarms Events and Statistics 1000 A2 GB22 10 10 20 June 2005...
Page 212: ...11 Maintenance and Services 1000 A2 GB22 10 11 30 June 2005...
Page 218: ...12 Integrated Monitoring 1000 A2 GB22 10 12 6 June 2005...