June 2005
1-3
1000-A2-GB22-10
1. JetCraft Overview
Performance monitoring
JetCraft includes performance monitoring tools for routine
maintenance and network capacity planning. When initiated,
JetCraft collects information on equipment performance, such as
total calls active on a CPX-1000 and virtual circuit bandwidth
usage.
Alarms reporting
JetCraft includes an alarm sequence ID and a customizable
alarm polling interval.
Troubleshooting and
maintenance
Switchover: JetCraft allows you to initiate a switchover, where
two redundant cards exchange their active/standby states.
Hot swap: JetCraft allows you to hot swap (planned or
unplanned) a card on module without affecting the operation of
the CPX-1000.
Loop back: JetCraft provides a diagnostics tool to test the
inbound traffic.
Database backup and restore: the service provider can create
CPX-1000 provisioning database files, use a File Transfer
Protocol (FTP) application to transmit and receive the
provisioning database files to and from a CPX-1000, and then
restore the CPX-1000 provisioning database using the
appropriate JetCraft menu option.
In addition, you can maintain and upgrade the software for
associated IADs through the JetCraft interface.
Integrated Monitor
A diagnostic tool to provide an a real-time view of the health of
a CPX-1000 and its associated managed domain.
Security
JetCraft provides a default user ID (cpxuser) and password
(cpxuser) and uses three user groups to control access to the
CPX-1000.
Table 1–1. JetCraft Features (Continued)
Features
Description
Summary of Contents for Jetstream CPX-1000
Page 1: ...Jetstream JetCraft User s Guide Release 2 6 Document No 1000 A2 GB22 10 June 2005...
Page 6: ...E June 2005 1000 A2 GB22 10...
Page 42: ...3 JetCraft Basic Operations 1000 A2 GB22 10 3 10 June 2005...
Page 64: ...5 CPX 1000 Configuration 1000 A2 GB22 10 5 14 June 2005...
Page 77: ...June 2005 7 3 1000 A2 GB22 10 7 Interface Groups Figure 7 1 Interface Group Tabular View...
Page 162: ...9 IAD Profiles and IADs Provisioning 1000 A2 GB22 10 9 52 June 2005...
Page 182: ...10 Alarms Events and Statistics 1000 A2 GB22 10 10 20 June 2005...
Page 212: ...11 Maintenance and Services 1000 A2 GB22 10 11 30 June 2005...
Page 218: ...12 Integrated Monitoring 1000 A2 GB22 10 12 6 June 2005...