![Paradyne Jetstream CPX-1000 User Manual Download Page 84](http://html1.mh-extra.com/html/paradyne/jetstream-cpx-1000/jetstream-cpx-1000_user-manual_3647912084.webp)
7. Interface Groups
1000-A2-GB22-10
7-10
June 2005
Step 6
Click to select the
RT Provision
checkbox if you want to enable
the Class 5 switch to assign CRVs on the CPX-1000.
Step 7
Select a secondary DS1 number from the
Secondary DS1
drop-
down list. For example, selecting 4 means that port 4 will be
assigned as the secondary DS1 channel.
Step 8
Select a channel by clicking the PG/channel, then make the
assignment by clicking the > button.
Notes
You can select Real Time (RT) provisioning only at the
initial creation of the Interface Group. You can neither
modify nor remove RT provisioning once it’s selected.
If you want to remove RT provisioning after the creation
of Interface Group, you must first delete the desired
Interface Group then reprovision it without the RT
provisioning option.
You cannot change the primary DS1.
Note
The DS1 port assignment is populated sequentially. For
example, the first assignment is for the primary and the
second assignment is the secondary.
Note
If the channel is assigned to the unintended DS1, click
the < button to return the port to the DS1 Assignment
area.
Summary of Contents for Jetstream CPX-1000
Page 1: ...Jetstream JetCraft User s Guide Release 2 6 Document No 1000 A2 GB22 10 June 2005...
Page 6: ...E June 2005 1000 A2 GB22 10...
Page 42: ...3 JetCraft Basic Operations 1000 A2 GB22 10 3 10 June 2005...
Page 64: ...5 CPX 1000 Configuration 1000 A2 GB22 10 5 14 June 2005...
Page 77: ...June 2005 7 3 1000 A2 GB22 10 7 Interface Groups Figure 7 1 Interface Group Tabular View...
Page 162: ...9 IAD Profiles and IADs Provisioning 1000 A2 GB22 10 9 52 June 2005...
Page 182: ...10 Alarms Events and Statistics 1000 A2 GB22 10 10 20 June 2005...
Page 212: ...11 Maintenance and Services 1000 A2 GB22 10 11 30 June 2005...
Page 218: ...12 Integrated Monitoring 1000 A2 GB22 10 12 6 June 2005...