background image

 8

Verifying that Self-Test Passed

1. Follow this menu selection sequence from the Main Menu and press Enter after

each selection:

Main Menu

Status

System and Test Status

2. Check the Self-Test Results column (in the center of the System and Test Status

screen).

– If 

Passed 

appears, the FrameSaver unit successfully completed the self-test.

– If any failure messages appear in this column, reset the unit by disconnecting,

then reconnecting the power cord. The unit will perform the self-test again. If the
failure reappears, call your service representative for assistance.

Setting the System Clock

To set up the system clock:

1. Select System Information.

Main Menu

Control

System Information

2. Move the cursor to the Date, then the Time field to enter:

– Date in the mm/dd/yyyy format (month/day/year)
– Time in the hh:mm format (hours:minutes)

3. Save the settings.

Assigning the Node IP Address

1. Set up the node.

Main Menu

Configuration

Management and Communication

Node IP

2. Minimally, enter the following options:

– Node IP Address
– Node Subnet Mask

3. Save the configuration.

Summary of Contents for FrameSaver SLV 9820-C

Page 1: ...uals FrameSaver Frame Relay Devices Select the following document 9820 A2 GB20 FrameSaver SLV 9820 User s Guide To request a paper copy of a Paradyne document Within the U S A call 1 800 PARADYNE 1 80...

Page 2: ...circuit breaker within 6 feet of the FrameSaver unit A clean well lit and ventilated site that is free from environmental extremes One to two feet of clearance for cable connections A physical connect...

Page 3: ...s X 21 DTE adapter cable EIA 530A to X 21 1 foot 3 meters 9008 F1 521 035 0384 1031 035 0302 0131 Equipment with V 35 interfaces MS34 connectors V 35 cable kit which includes a V 35 network cable 10 f...

Page 4: ...Make sure the locking tab snaps securely into the jack 98 16197 Power Cord Transformer FrameSaver 9820 Shown O K A L M Locking Tab Grounded Power Outlet 2 Insert the socket end of the power cord into...

Page 5: ...s COM port 99 16198 01 To Connect to a PC or Async Terminal COM Port FrameSaver 9820 Shown 3 Insert the other end of the cable into the PC or VT100 compatible terminal 4 Tighten the screws on each sid...

Page 6: ...editing 1 From the Main Menu press the down arrow key twice so the cursor is on Configuration 2 Press Enter to display the Configuration menu The Load Configuration From menu appears 3 Press Enter to...

Page 7: ...e central site and the remote sites Frame Relay Router Central Site FrameSaver Unit NMS Munich Headquarters Port NET NTU NTU NTU NET Port Frame Relay Router Remote Site FrameSaver Unit London Office D...

Page 8: ...ting the power cord The unit will perform the self test again If the failure reappears call your service representative for assistance Setting the System Clock To set up the system clock 1 Select Syst...

Page 9: ...guration options To configure the physical interfaces 1 Select the Network physical configuration options Main Menu Configuration Network Physical 2 Select the appropriate Port Type 3 Press Ctrl a and...

Page 10: ...these features Main Menu Auto Configuration The default discovery mode is 1MPort In this mode for each DLCI discovered on the network a multiplexed network DLCI and a standard data port DLCI will be...

Page 11: ...etwork interface is set up correctly and it is operational If not make sure both ends of the network cable are properly seated and secured 4 Verify that the network physical options are configured cor...

Page 12: ...ect DLCI Records on the network interface Configuration Network DLCI Records 2 Select Modify The Modify DLCI Record for DLCI Number prompt appears 3 Select the DLCI that will be used by pressing the s...

Page 13: ...t the entire path from the remote unit to the NMS is functioning To run the IP Ping test NMS trap managers must have been configured for the remote unit One of those trap managers must be the central...

Page 14: ...ck Is the Port OK LED on If yes the port is set up correctly and is operational If no check that both ends of the cable are properly seated and secured Check Health and Status messages in the left col...

Page 15: ...ext check the DLCI s status Check PVC Connections Check PVC connections to verify that all PVCs including management PVCs are configured and to see whether the PVC is active or not 1 Return to the Sta...

Page 16: ...16 FrameSaver 9820 Rear Panel 98 16189 FrameSaver 9820 Front Panel 98 16201 O K O K A L M T S T O K 9820 PORT FrameSaverTM SLV FrameSaverTM SLV NETWORK...

Page 17: ...lable certified for use in the country of installation Paradyne power supply part number 327 0107 0031 is recommended This power supply includes a special mating connector for connection to this equip...

Page 18: ...the FCC rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can r...

Page 19: ...by Directive 93 68 EEC Directive 91 263 EEC Council Directive of 29 April 1991 on the approximation of the laws of the member states concerning telecommunication terminal equipment including mutual r...

Page 20: ...rent information by fax or to speak with a company representative Within the U S A call 1 800 870 2221 Outside the U S A call 1 727 530 2340 Document Feedback We welcome your comments and suggestions...

Reviews: