3-1
7970-A2-GB20-00
August 1999
Initial Startup and Configuration
3
Overview
This chapter provides instructions on how to access and configure your
Hotwire 79xx Standalone Termination Unit for the first time. This chapter includes
procedures for:
H
Connecting power to the unit.
H
Connecting the unit to the network.
H
Connecting the unit to a DTE.
H
Connecting the unit to a system terminal.
H
Providing initial unit
identity information
or changing existing identity
information.
H
Configuring your unit using the
Configuration Edit menus
or internal switches.
H
Choosing the current or factory default configuration options.
H
Modifying current configuration options
using the Configuration Edit/Display
menu.
H
Downloading configuration options
from a TFTP server.
H
Saving your configuration options.
H
Downloading unit firmware
from a TFTP server.
Summary of Contents for 7984
Page 10: ...Contents vi 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Page 90: ...Testing 6 20 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Page 104: ...Security 8 8 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Page 156: ...Technical Specifications D 2 7970 A2 GB20 00 August 1999 ...