4. Configuration
3160-A2-GB24-10
March 2001
4-43
Configuring for External Timing
Procedure
To configure 2-port and 4-port DSU/CSUs for external timing:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Gen selection appears on the
screen.
5. Select Gen.
6. Press F1 (Next) to display the next configuration option (Clock Src).
7. Select the master clock source. For external, press the
key until the Ext
selection appears on the screen.
8. Select Ext (external timing).
9. Select the appropriate external clock rate by pressing the corresponding
Function key. This step is mandatory if you have chosen external clocking.
F1
F2
F3
Edit:
NET Chan Gen
F1
F2
F3
Clock Src:Ext
Prt1 Int Ext
F1
F2
F3
Clock Rate:1544
Next 2048 1544
Summary of Contents for 3165
Page 14: ...Contents viii March 2001 3160 A2 GB24 10 ...
Page 18: ...About This Guide xii March 2001 3160 A2 GB24 10 ...
Page 26: ...1 Introduction 1 8 March 2001 3160 A2 GB24 10 ...
Page 38: ...2 Installation 2 12 March 2001 3160 A2 GB24 10 ...
Page 54: ...3 Using the Front Panel 3 16 March 2001 3160 A2 GB24 10 ...
Page 102: ...4 Configuration 4 48 March 2001 3160 A2 GB24 10 ...
Page 110: ...5 Security 5 8 March 2001 3160 A2 GB24 10 ...
Page 162: ...8 Testing 8 24 March 2001 3160 A2 GB24 10 ...
Page 164: ...A Front Panel Menu A 2 March 2001 3160 A2 GB24 10 ...
Page 222: ...D Configuration Worksheets D 14 March 2001 3160 A2 GB24 10 ...
Page 240: ...E Pin Assignments E 18 March 2001 3160 A2 GB24 10 ...
Page 272: ...F SNMP MIB Objects F 32 March 2001 3160 A2 GB24 10 ...
Page 280: ...G IP Network Addressing Scenarios G 8 March 2001 3160 A2 GB24 10 ...
Page 300: ...J Equipment List J 2 March 2001 3160 A2 GB24 10 ...