V00028CA Rev03
www.panduit.com
Page
8
of
18
ZDF48-RA - Power Installation
10.
Remove the outlet box cover with the (2) 20 amp power outlets.
Figure 7: Outlet Box and Cover
11.
Punch out the center knockout of the outlet box.
12.
Pull the plant power through the conduit into the outlet box and terminate the power and ground according to
local IEC code.
13.
Re-install the outlet box cover onto the box.
14.
OPTIONAL: Remove the side gland plate and install the air conditioner per instructions supplied with the AC
unit.
ZDF48-EA - Power Installation
15.
Install an outlet box and power outlets with that are compliant with local IEC standards. Four #10-32 holes are
provided on the right side of the lower base plate.
16.
Punch out the center knockout of the outlet box.
17.
Pull the plant power through the conduit into the outlet box and terminate the power and ground according to
local IEC code.
18.
Install an outlet box cover onto the box.
19.
OPTIONAL: Remove the side gland plate and install the air conditioner per instructions supplied with the AC
unit.
20.
Tak-Ty Power Cords for the switches to the Rear Rail as shown in
. The aqua arrows show
the Tak-Ty locations. Tak-Ty the grounding jumpers from with the power cords to the rail.