INSTRUCTIONS FS149A
For Technical Support: www.panduit.com/resources/install_maintain.asp
Figure 13
4 RU Cable Manager
6.
Patch Panel
FRONT
Connector Installation
:
a. Install 4RU cable manager to the leg as shown.
(See Figure 13).
Figure 14
Figure 15
b. Route 1st fiber bundle of 72 fibers cable through brushes in
opening as shown. Bring fiber cable up toward patch panel.
Route cables through 1st bottom position in 4RU cable
canager. Secure cables to 4RU manager 1st position with
hook-n-loop. (See Figures 14 through 15).
Figure 16
Figure 17
1st bundle of 72
fiber cables
2nd bundle of
72 fiber cables
3rd bundle of 72
fiber cables
4th bundle of 72
fiber cables
c. Route 2nd fiber bundle of 72 fiber cables through brushes in opening as shown. Bring fiber bundle up towards the patch panel.
Route bundle through 2nd bottom position in 4RU cable manager. Secure bundle to 4RU 2nd position with hook-n-loop.
(See Figures 16 through 17).
Page 7 of 19