background image

INSTRUCTIONS FS149A

For Technical Support: www.panduit.com/resources/install_maintain.asp

bundle 4

bundle 3

bundle 2

bundle 1

Attach all bundles
together with (1)
hook-n-loop

Figure 21

middle rail

FIgure 22

middle
rail

Figure 18

Figure 19

1st bundle of 72
fiber cables

2nd bundle of
72 fiber cables

3rd bundle of 72
fiber cables

4th bundle of 72
fiber cables

d. Route the remaining fiber bundles of 72 cables through brushes in opening as shown. Bring fiber cable up by bundles towards patch

panel. Route bundle 3 through 4RU cable manager position 3. Route bundle 4 through top position 4 in 4RU cable manager. Secure fiber

cable bundles with hook-n-loop. (See Figures 17 through 19).

slots on both
sides of the
middle rail

Figure 20

e. Secure bundle 4 to slots on the middle rail (see Figure 20)

using hook-n-loop.

f. Attach all of the fiber cables to each other with one large hook-n-loop.

(as shown in Figures 21 through 24).
The intent is to bundle all fiber cables together so that the patch
panel does not touch the fiber cables when the patch panel
is rotated and set back into place after it is populated.

Page 8 of 19

Summary of Contents for FLEX-ZRFECG

Page 1: ...Point them towards the center making a cross from the corners See Fig ure 2 2 Ensure that the plate is allowed to pivot from side to side NOTE If Grid Runner is placed above pedestal plate then the m...

Page 2: ...2 of 19 Installation of Pedestal Mount Assembly to Various Pedestal Sizes 3 The FLEX ZRFEG may be mounted to 7 8 square or up to 2 diameter round pedestals by adjusting the engagement of the U Bolt Fi...

Page 3: ...ering the opposite side on the pedestal mounting brackets to manually align the four corners and mounting hole locations See Figure 4 1 and 4 2 5 Once all four corners and mounting holes are aligned i...

Page 4: ...HE LASER OFF WHEN IT IS NOT IN USE OR IS LEFT UNATTENDED FOR A PERIOD OF TIME REMOVE THE BATTERIES WHEN STORING FOR AN EXTENDED PERIOD OF TIME TO AVOID DAMAGE TO THE TOOL SHOULD THE BATTERIES DETERIOR...

Page 5: ...t cassettes See Figures 37 through 39 for installation of 4 port and 6 port rails for use with 4 port and 6 port cassettes Figure 8 Figure 9 Page 5 of 19 Figure 6 Table 1 MAXIMUM MODULE POPULATION PER...

Page 6: ...Mate MPO connectors from fiber cable to rear of cassettes starting from the bottom Bundle strands together with hook n loop See Figure 10 Figure 10 hook n loop Figure 12 Figure 11 c Install remaining...

Page 7: ...oute cables through 1st bottom position in 4RU cable canager Secure cables to 4RU manager 1st position with hook n loop See Figures 14 through 15 Figure 16 Figure 17 1st bundle of 72 fiber cables 2nd...

Page 8: ...cable up by bundles towards patch panel Route bundle 3 through 4RU cable manager position 3 Route bundle 4 through top position 4 in 4RU cable manager Secure fiber cable bundles with hook n loop See F...

Page 9: ...23 Figure 24 Fasten all fiber cable bundles together with one hook n loop g Grab handle and rotate patch panel downward ensuring that no fiber cables are pinched See Figure 25 Page 9 of 19 h Populate...

Page 10: ...for ease of editing and label replacement when necessary The labeling location on top is PANDUIT Part 00053EEF which is removable Labeling See Figure 27 The labeling layout for the patch panel see Fi...

Page 11: ...s 0 0 0 5 3 E E F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64...

Page 12: ...e Figure 29 Disconnect trunk cable from the rear of the cassette and con nect it to the rear of the replacement cassette Re install cas sette or MPO FAP opposite the way it was removed Align the rear...

Page 13: ...ages shown in top view for clarity From the rear of the patch panel select the FAP to add additional MPO trunk cables to Insert the MPO connector into the rear of the FAP diagonally between the posts...

Page 14: ...y Once the rail is fully re inserted the front of the rail will snap into position Pull forward on the rail to ensure it is properly installed While continuing to apply downward pressure on the rail b...

Page 15: ...urations Only patch panel trays are shown for clarity 12 Port Configuration no removable rails installed on tray See Figure 37 6 Port Configuration 1 black removable rail per tray See Figure 38 4 Port...

Page 16: ...n suc cessfully attached drop the cover into the enclosure as shown See Figures 41 through 42 Option 1 HD Flex Zone Raised Floor Enclosure Cover FLEX ZRFECG Enclosure s Cover Installation Attach Adhes...

Page 17: ...ll Partition FLEX ZRFEWPG Lift up and remove both patch panels Secure partition walls with a total of 8 screws provided in the circled locations shown below in Figure 45 Install 4RU cable managers int...

Page 18: ...le bundle 1 and working upward to cable bundle 4 Secure each bundle to the 4RU cable manager with hook n loop as shown in Figure 48 Page 18 of 19 Secure cables at rear of cassette through mounting hol...

Page 19: ...h cassette routed to the left down and then to the right through the 4RU cable manager as shown in Figure 49 Rotate the patch panel mak ing sure that the fiber cables do not interfere with hit the enc...

Reviews: