INSTRUCTIONS FS149A
For Technical Support: www.panduit.com/resources/install_maintain.asp
bundle 4
bundle 3
bundle 2
bundle 1
Attach all bundles
together with (1)
hook-n-loop
Figure 21
middle rail
FIgure 22
middle
rail
Figure 18
Figure 19
1st bundle of 72
fiber cables
2nd bundle of
72 fiber cables
3rd bundle of 72
fiber cables
4th bundle of 72
fiber cables
d. Route the remaining fiber bundles of 72 cables through brushes in opening as shown. Bring fiber cable up by bundles towards patch
panel. Route bundle 3 through 4RU cable manager position 3. Route bundle 4 through top position 4 in 4RU cable manager. Secure fiber
cable bundles with hook-n-loop. (See Figures 17 through 19).
slots on both
sides of the
middle rail
Figure 20
e. Secure bundle 4 to slots on the middle rail (see Figure 20)
using hook-n-loop.
f. Attach all of the fiber cables to each other with one large hook-n-loop.
(as shown in Figures 21 through 24).
The intent is to bundle all fiber cables together so that the patch
panel does not touch the fiber cables when the patch panel
is rotated and set back into place after it is populated.
Page 8 of 19