15/05/96
9
MPC2000 01/96B
N
44
45
46
47
48
49
26
3
24
1
25
2
33
10
27
4
28
5
34
11
29
6
30
7
31
8
32
9
13
36 37
14
15
38 39
16
17
40 41
18
35
93
92
91
90
89
88
87
86
85
84
83
82
L1
L2
L3
N
(Not always available)
78
80
79
81
77
76
75
74
73
72
71
70
69
68
67
66
23
22
21
N
L3
L2
L1
(-)
(+)
52
51
50
55
54
53
MPC2000 WIRING DIAGRAM
MPC2000
68
72
76
69
73
77
67
71
75
68
72
76
69
73
77
61
62
63
12
64
65
CT4
CT3
CT2
CT1
82
83
84 85
86
87 88
89
90 91
92
93
42 19
20
43
1A
5A
C
1A
5A
C
1A
5A
C
1A
5A
C
1A
5A
C
1A
5A
C
1A
5A
C
1A
5A
C
NOTE:
RELAY SHOWN WIRED FOR 1 AMP
CT SECONDARIES
SWAMPING
RESISTOR
STOP [NC]
START CONTACTOR A [NO]
START CONTACTOR B [NO]
PLANT INTERLOCK [OPEN=LOCKED OUT]
LOCAL/REMOTE [OPEN=LOCAL]
PLC/SERIAL PORT [OPEN=PLC]
AUTHORISED KEY [CLOSED=AUTHORISED]
PLC RESET [NO]
PLC CONTROL A [OPEN=STOP]
PLC CONTROL B [OPEN=STOP]
SPEED SWITCH [OPEN=HIGH]
CONTACTOR A STATUS
CONTACTOR B STATUS
ISOLATOR
EXTERNAL EMERGENCY STOP [NC]
ALTERNATIVE RESIDUAL FAULT CONNECTION
EXTERNAL FAULT 3
EXTERNAL FAULT 2
OR SYSTEM TEST
[SET BY DIP SWITCH 1]
DIP SWITCH 1
ON = TEST FACILITY AVAILABLE
OFF = EXTERNAL FAULT 3
CONTACTOR B
CONTACTOR A
STOP B
STOP A
110/240V AC
[80-265V DC
OPTIONAL]
INTERNAL
POWER
SUPPLY
ON
LOGIC SUPPLY
ALT. AUX POWER SUPPLY
3 THERMISTOR OR PT100 INPUTS
DIP SWITCH SETTINGS
ON [THERMISTOR]
OFF [RTD]
CT1
CT2
CT3
CT4
MOTOR
RS485 SERIAL PORT
SHIELD
SCREEN
MEASURMENT
VOLTAGES
SCREEN
SCREEN
AUX 2 RELAY [TRIP]
AUX 1 RELAY [ALARM]
GND
INTERNAL EMERGENCY STOP
OPTIONAL OR KEY SWITCH
THERMISTOR
[0.1K-30K]
PT100
[100-2400]
MAIN CONTACTOR
CONTROL
VOLTAGE
STOP B
STOP A
CONTACT SHOWN IN
DE-ENERGISED STATE
NOTE TERMINALS 74,70,
66 & 21 MUST BE CONNECTED
TO THE EARTH STUD
TERMINAL 63