
Basic operation
18
4.2.3
Schedule mode
In case start mode is set to “4-schedule”, refer to the fol-
lowing procedure to allocate a welding condition number
to each start input.
Note
For “15-schedule” start mode, it is not necessary to allo-
cate welding condition, as combination of the start inputs
directly specify a welding condition. For details, please
refer to section “ Advanced functions”.
Operation
Lamp / indicator
Indication
(
1
)
Selecting the Schedule mode
• Press the SCHEDULE mode select key. .......
•JOB lamp:
ON
•START lamp:
ON
•Start No. indicator:
“1”
(
2
)
Selecting the job No. for “START
I
”
• Press ENTER/SHIFT key ..............................
•START lamp:
OFF
•JOB lamp:
ON
•Job No. indicator:
Currently stored job number.
• Select a number using “+” or “-” key. .............
Job No. indicator:
Selected number
• Press ENTER/SHIFT key ..............................
•JOB lamp:
OFF
•Job No. indicator:
OFF
•START lamp:
ON
(
3
)
Selecting the job No. for “START
II
”
• Press “+”........................................................
•Start No. indicator:
“2”
• Press ENTER/SHIFT key ..............................
•START lamp:
OFF
•JOB lamp:
ON
•Job No. indicator:
Currently stored job number.
• Select a number using “+” or “-” key. .............
Job No. indicator:
Selected number
• Press ENTER/SHIFT key ..............................
•JOB lamp:
OFF
•Job No. indicator:
OFF
•START lamp:
ON
* Repeat the procedure (3) to select the job numbers for Start
III
and Start
IV
.
Summary of Contents for YF-0201Z5HGF
Page 22: ...TSMP222 TSM222 ...
Page 33: ...8 Circuit diagram Circuit diagram 33 TSMP222 YF 0201Z5HGF Circuit diagram ...
Page 37: ......