35
Setting Options / Display
Default Setting
Menu
Sterilization: Ope. time (max)
0:10
Set sterilizing time
(in hours and minutes)
Force DHW:Start Temp.
35 °C
Set auto Force DHW
activate temperature
7 Installer setup Service setup
7.1
Pump maximum speed
To set the maximum speed of
the pump.
Setting the flow rate, max. duty and operation
ON/OFF of the pump.
Flow rate: XX:X L/min
Max. Duty: 0x40 ~ 0xFE,
Pump: ON/OFF/Air Purge
7.2
Dry concrete
To dry the concrete (floor, walls,
etc.) during construction.
Do not use this menu for any
other purposes and in period
other than during construction
Edit to set the temperature of dry concrete.
ON / Edit
Edit
Stages: 1
Temperature: 25 °C
Heating temperature
for drying the
concrete.
Select the desired
stages: 1 ~ 10,
range: 1 ~ 99
ON
Confirm the setting temperatures of dry
concrete for each stage.