2 Safety Precautions
2.1. General Guidelines
1. When conducting repairs and servicing, do not attempt to modify the equipment, its parts or its materials.
2. When wiring units (with cables, flexible cables or lead wires) are supplied as repair parts and only one wire or some of the wires
have been broken or disconnected, do not attempt to repair or re-wire the units. Replace the entire wiring unit instead.
3. When conducting repairs and servicing, do not twist the Faston connectors but plug them straight in or unplug them straight out.
4. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or
damaged by the short circuit.
5. After servicing, see to it that all the protective devices such as insulation barriers, insulation papers shields are properly
installed.
6. After servicing, make the following leakage current checks to prevent the customer from being exposed to shock hazards.
2.2. Touch-Current Check
1. Plug the AC cord directly into the AC outlet. Do not use an isolation transformer for this check.
2. Connect a measuring network for touch currents between each exposed metallic part on the set and a good earth ground such
as a water pipe, as shown in Figure 1.
3. Use Leakage Current Tester (Simpson 228 or equivalent) to measure the potential across the measuring network.
4. Check each exposed metallic part, and measure the voltage at each point.
5. Reserve the AC plug in the AC outlet and repeat each of the above measure.
6. The potential at any point (TOUGH CURRENT) expressed as voltage U
1
and U
2
, does not exceed the following values:
For a. c.: U
1
= 35 V (peak) and U
2
= 0.35 V (peak);
For d. c.: U
1
= 1.0 V,
Note:
The limit value of U
2
= 0.35 V (peak) for a. c. and U
1
= 1.0 V for d. c. correspond to the values 0.7 mA (peak) a. c. and 2.0
mA d. c.
The limit value U
1
= 35 V (peak) for a. c. correspond to the value 70 mA (peak) a. c. for frequencies greater than 100 kHz.
7. In case a measurement is out of the limits specified, there is a possibility of a shock hazard, and the equipment should be
repaired and rechecked before it is returned to the customer.
Figure 1
6
TH-50PZ700B / TH-50PZ700E / TH-50PY700F / TH-50PY700P
Summary of Contents for Viera TH-50PZ700B
Page 5: ...1 Applicable signals 5 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 23: ...8 2 Lead of Wiring 2 23 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 24: ...8 3 Lead of Wiring 3 24 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 28: ...9 4 No Picture 28 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 40: ...40 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 158: ...16 2 Packing Exploded Views 1 158 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 159: ...16 3 Packing Exploded Views 2 159 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 160: ...16 4 Packing Exploded Views 3 160 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...
Page 161: ...16 5 Replacement Parts List Notes 161 TH 50PZ700B TH 50PZ700E TH 50PY700F TH 50PY700P ...