6.2.12.1. Reassembly Notes
1. Installation/Alignment of Intermediate Gear A, Lift Gear and P5 Arm
Unit
A. Rotate the Lift Gear so that Hole A on Lift Gear is a Through Hole
with a hole on chassis.
B. Install the Intermediate Gear A so that the hole on Intermediate Gear
A is aligned with the hole on Lift Gear.
C. Install the P5 Arm Unit so that it contacts with the tab of chassis.
Fig. J10-2
2. Installation of Opener Piece
A. Install the Opener Piece so that the slot of the Opener Piece is
inserted to the Pin of Pinch Arm Unit
Fig. J10-3
48
Summary of Contents for OmniVision PV-QV201
Page 9: ...2 Fault indication will be displayed in F I P as shown Fig 2 2 FIg 2 3 9 ...
Page 13: ...5 1 4 1 3 Service Position 2 2 Model M N Fig 4 2 2 13 ...
Page 27: ...Fig D2 6 1 2 1 Notes in chart 27 ...
Page 30: ...Fig D5 2 30 ...
Page 32: ...32 ...
Page 33: ...6 2 2 Inner Parts Location Fig J1 1 33 ...
Page 34: ...34 ...
Page 36: ...Fig J2 1 2 36 ...
Page 67: ...11 2 MECHANISM BOTTOM SECTION 67 ...
Page 68: ...11 3 CASSETTE UP COMPARTMENT SECTION 68 ...
Page 70: ... Model PV V4511 PV V4521 PV V4521 K VHQ 451 70 ...
Page 71: ... Model PV V4611 71 ...
Page 73: ... Model PV V4611 73 ...
Page 78: ...12 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 78 ...
Page 81: ... 81 ...
Page 88: ... 88 ...
Page 90: ...90 ...
Page 95: ...95 ...
Page 105: ...105 ...
Page 109: ...109 ...
Page 145: ...1 2 Schematic Diagram Circuit Board Layout 2 ...