4 ASSEMBLY PROCEDURE
4.1 ASSEMBLY PROCEDURE
No.
Item
Fig.
Grease
Procedure
*1
S3 Base U.
--
1) Put S3 Base U on and tighten a screw.
•
1) Put hole of T4 Guide to hole of chassis and tighten a screw.
•
2) Put Eject Lever on and a washer.
--
3) Put boss of Pulley to hole of chassis on. Hole of chassis under pulley should
be visible through slit of Pulley.
*2
T4 Guide , Eject Lever, Pulley Cover
& Pulley.
--
4) Put Pulley Cover on Pulley and tighten 2 screws.
•
1) Put Mode Sw on.
•
2) Put Deceleration Gear (B) on
•
3) Put Deceleration Gear (A) on and a washer.
*3
Mode Switch , Deceleration Gears &
Tension Plate.
•
4) Put Tension Plate on and 2 washers.
--
1) Put Loading Motor Unit on and tighten 2 screws.
4
Loading Motor unit & Mechanism
Interface Flex.
--
2) Put Mechanism Interface Flex on and tighten 4 screws. After that, solder at
terminal of Mode Sw.
--
1) Put Capstan Motor on and tighten 3 screws.
Timing Belt should be between Pulley and boss.
5
Capstan Holder & Capstan Motor
--
2) Put Capstan Holder on and tighten 2 screws.
6
Drive Gear
--
1) Put a washer to shaft and install Drive Gear.
Timing Belt should be wound around Drive Gear. After that, confirm Timing
Belt and Gear are rotated together.
7
Boat Radon
•
1) Put hole of Boat radon to shaft of chassis.
8
Chassis Radon
•
1) Put Chassis Radon and a washer on.
9
Cam Gear
•
1) Put Cam Gear on. Phase Mark should be in the same line with chassis of
shaft..
•
1) Put Interface Gear(C) & (D).
Each phase mark should be in the same line.
10
Interface Gears
•
2) Put Interface Gear(A) & (B) on.
1) Put boss of Tension Lever into slit of Cam Gear and Tension Plate, then
tighten a screw.
11
Tension Lever & Eject Arm.
--
2) Put boss of Eject Arm into slit of Cam Gear.
Put a washer on shaft of chassis.
1) Put boss of Pinch Beetle into slit of Mode Sw.
2) Put boss of Release Beetle into slit of Mode Sw.
12
Pinch Beetle & Release Beetle
•
3) Put a washer on.
1) Keep sliding Gear Cover and put it on.
13
Gear Cover
--
2) Tighten a screw.
1) Put S-Loading Gear on.
14
T-Loading Gear & S-Loading Gear
•
2) Put T-Loading Gear on.
Each phase mark should be in the same line.
--
1) Make half loading until Connection Arm comes out.
--
2) Connect Arm of S & T Loading Gear and Connection Arms.
a) Hold Loading Gear side.
b) Push Arm of S & Tloading Gear into slit of connection arms.
15
Rail Unit
--
3) Tighten 4 screws.
Summary of Contents for Mini DV
Page 2: ...1 MECHANICAL PARTS LOCATION 1 1 UPPER SIDE ...
Page 3: ...1 2 BOTTOM SIDE 1 3 SENSOR POSITION ...
Page 6: ...3 DISASSEMBLY PROCEDURE 3 1 PREPARATION FOR DISASSEMBLY ...
Page 9: ...Fig D2 1 Fig D2 2 Fig D2 3 ...
Page 10: ...Fig D3 1 Fig D3 2 Fig D3 3 ...
Page 11: ...Fig D4 1 Fig D4 2 Fig D4 3 ...
Page 12: ...Fig D5 1 Fig D5 2 Fig D6 1 ...
Page 13: ...Fig D6 2 Fig D7 1 Fig D7 2 ...
Page 14: ...Fig D7 3 Fig D8 ...
Page 15: ...Fig D9 Fig D10 Fig D11 Fig D12 Fig D13 ...
Page 16: ...Fig D14 Fig D15 Fig D16 Fig D17 1 ...
Page 17: ...Fig D17 2 Fig D18 1 Fig D18 2 ...
Page 18: ...Fig D19 Fig D20 1 Fig D20 2 ...
Page 19: ...Fig D20 3 Fig D21 ...
Page 23: ...Fig W1 3 Fig W1 4 Fig A1 ...
Page 24: ...Fig A2 1 Fig A2 2 Fig A2 3 ...
Page 25: ...Fig A2 4 Fig A3 Fig A4 ...
Page 26: ...Fig A5 1 Fig A5 2 ...
Page 27: ...Fig A6 Fig A7 Fig A8 ...
Page 28: ...Fig A9 Fig A10 1 Fig A10 2 ...
Page 29: ...Fig A11 Fig A12 Fig A13 ...
Page 30: ...Fig A14 Fig A15 1 Fig A15 2 ...
Page 31: ...Fig A15 3 Fig A16 1 Fig A16 2 ...
Page 32: ...Fig A17 1 Fig A17 2 Fig A17 3 ...
Page 33: ...Fig A17 4 Fig A18 1 Fig A18 2 ...
Page 34: ...Fig A18 3 Fig A19 1 Fig A19 2 ...
Page 35: ...FIg A19 3 Fig A20 1 Fig A20 2 ...
Page 36: ...Fig A20 3 Fig A21 1 Fig A21 2 ...
Page 39: ...Fig AD2 1 Fig AD2 2 Fig AD2 3 Fig AD4 1 Fig AD4 2 ...
Page 40: ...Fig AD5 1 Fig AD5 2 Fig AD6 1 ...
Page 41: ...Fig AD6 2 ...
Page 42: ...6 EXPLODED VIEWS 6 1 Q1 Q2 VCR MECHANISM SECTON 1 ...
Page 43: ...6 2 Q1 Q2 VCR MECHANISM SECTION 2 ...
Page 44: ...6 3 Q3 VCR MECHANISM SECTION 1 ...