background image

6 EXPLODED VIEWS 

6.1 Q1& Q2 VCR MECHANISM SECTON (1) 

 

 

Summary of Contents for Mini DV

Page 1: ...DER NO VMD0109026C8 Digital Video Camera Recorder Q MECHANISM Including Q1 Q2 Q3 2001 Matsushita Electric Industrial Co Ltd All rights reserved Unauthorized copying and distribution is a violation of law ...

Page 2: ...1 MECHANICAL PARTS LOCATION 1 1 UPPER SIDE ...

Page 3: ...1 2 BOTTOM SIDE 1 3 SENSOR POSITION ...

Page 4: ...MECHANICAL ADJUSTMENT No Parts number Parts Name Q ty New Remarks 7 VFK1278 Post Adjustment Driver 1 8 VFK1638 Capstan Tilt Adj Jig 1 9 VFK1641 Envelope Detecor Board 1 10 VFM3110EDS PAL DV Alignment Tape 1 or VFM3010EDS NTSC 11 VFK1395 232C M3 I F Cable 1 TATSUJIN system 12 VFK1308E Measuring Board 1 TATSUJIN system 13 VFK1309 EVR Connecor Board 1 TATSUJIN system 14 VFK1309EX Connection Adaptor T...

Page 5: ...k Glove should be used when you apply oil 2 Do not apply pressure to this jig 3 If Brightness of LED become weak Battery SUM4 X 2 in the top of box should be changed 4 Inspect sensor pin regularly as following A Put Gage Block to sensor pin B Confirm LED is lit If not adjust sensor pin by rotating a screw ...

Page 6: ...3 DISASSEMBLY PROCEDURE 3 1 PREPARATION FOR DISASSEMBLY ...

Page 7: ...rms 7 Rail Unit Fig D7 3 3 Remove 4 screws 8 T Loading Gear S Loading Gear Fig D8 1 Take T Loading Gear out 2 Remove Cut Washer on S Loading Gear and take S Loading Gear out Removed Cut Washer can not be used again 9 Gear Cover Fig D9 1 Remove a screw and slide Gear Cover to take out 10 Pinch Beetle Release Beetle Fig D10 1 Remove a washer and take Pinch Beetle and Release Beetle out together 11 T...

Page 8: ...e Eject Lever out 20 T4 Guide Eject Lever Pulley Cover Pulley Fig D20 3 3 Remove 2 screw and take Pulley Cover out 4 Take Pulley out 21 S3 Base U Fig D21 1 Remove a screw for S3 adjustment and take S3 Base U 1 Procedure 2 for H Amp Unit is applied only Q1 Q2 mechanism 2 Procedure 19 21 can be changed in order Fig D1 1 Fig D1 2 ...

Page 9: ...Fig D2 1 Fig D2 2 Fig D2 3 ...

Page 10: ...Fig D3 1 Fig D3 2 Fig D3 3 ...

Page 11: ...Fig D4 1 Fig D4 2 Fig D4 3 ...

Page 12: ...Fig D5 1 Fig D5 2 Fig D6 1 ...

Page 13: ...Fig D6 2 Fig D7 1 Fig D7 2 ...

Page 14: ...Fig D7 3 Fig D8 ...

Page 15: ...Fig D9 Fig D10 Fig D11 Fig D12 Fig D13 ...

Page 16: ...Fig D14 Fig D15 Fig D16 Fig D17 1 ...

Page 17: ...Fig D17 2 Fig D18 1 Fig D18 2 ...

Page 18: ...Fig D19 Fig D20 1 Fig D20 2 ...

Page 19: ...Fig D20 3 Fig D21 ...

Page 20: ...ve Gear Timing Belt should be wound around Drive Gear After that confirm Timing Belt and Gear are rotated together 7 Boat Radon Fig A7 1 Put hole of Boat radon to shaft of chassis 8 Chassis Radon Fig A8 1 Put Chassis Radon and a washer on 9 Cam Gear Fig A9 1 Put Cam Gear on Phase Mark should be in the same line with chassis of shaft Fig A10 1 1 Put Interface Gear C D Each phase mark should be in t...

Page 21: ...rings to 2hooking portion of Sub chassis And also put LED Flat Cable back 18 LED Holder Cover plate Idler U Fig A18 3 3 Put LED Holder back Fig A19 1 1 Confirm loading and unloading is smooth Fig A19 2 2 Put Cylinder Unit Spring on and tighten 3 screws 19 Confirmation of Mechanism movement Cylinder Unit RT Flex Flame FIg A19 3 3 Put RT Flex Flame on and tighten 2 screws Fig A20 1 1 Put H Amp Unit ...

Page 22: ... washer jigs No Item Fig Procedure 1 Fig W1 1 1 Each Washers 2 Fig W1 2 1 Put a washer on tip of Jig 3 Fig W1 3 1 Put Jig on shaft 4 Washer Jigs Fig W1 4 1 Put a washer on shaft by pressing Jig Fig W1 1 Fig W1 2 ...

Page 23: ...Fig W1 3 Fig W1 4 Fig A1 ...

Page 24: ...Fig A2 1 Fig A2 2 Fig A2 3 ...

Page 25: ...Fig A2 4 Fig A3 Fig A4 ...

Page 26: ...Fig A5 1 Fig A5 2 ...

Page 27: ...Fig A6 Fig A7 Fig A8 ...

Page 28: ...Fig A9 Fig A10 1 Fig A10 2 ...

Page 29: ...Fig A11 Fig A12 Fig A13 ...

Page 30: ...Fig A14 Fig A15 1 Fig A15 2 ...

Page 31: ...Fig A15 3 Fig A16 1 Fig A16 2 ...

Page 32: ...Fig A17 1 Fig A17 2 Fig A17 3 ...

Page 33: ...Fig A17 4 Fig A18 1 Fig A18 2 ...

Page 34: ...Fig A18 3 Fig A19 1 Fig A19 2 ...

Page 35: ...FIg A19 3 Fig A20 1 Fig A20 2 ...

Page 36: ...Fig A20 3 Fig A21 1 Fig A21 2 ...

Page 37: ...r Plate 8 Idler U 9 Sub Chassis Unit 10 Pinch Arm 11 Center Gear 12 Rail Unit 13 S Loading Gear 14 T Loading Gear 15 Gear Cover 16 Pinch Beetle 17 Release Beetle 18 Tension Lever 19 Eject Arm 20 Interface Gears 21 Cam Gear 22 Chassis Radon 23 Boat Radon 24 Drive Gear 25 Capstan Holder 26 Capstan Motor 27 Loading Motor Unit 28 Mechanism Interface Flex 29 Mode Switch 30 Deceleration Gears 31 Tension...

Page 38: ...he Tatsujin 3 Confirmation of B E R Value 1 Tatsujin system Refer to Fig Fig AD2 1 1 Refer to Electrical Adjustment on the Tatsujin Fig AD4 1 1 Slide sensor pin to Capstan shaft After touching if OK LED should be lit Do not touch when you confirm LED lit or not 4 Capstan tilt Adjustment 1 Capstan Tilt Adj Jig VFK1638 2 Small Phillips Screw Driver Fig AD4 2 2 If Ng Capstan tilt should be adjusted a...

Page 39: ...Fig AD2 1 Fig AD2 2 Fig AD2 3 Fig AD4 1 Fig AD4 2 ...

Page 40: ...Fig AD5 1 Fig AD5 2 Fig AD6 1 ...

Page 41: ...Fig AD6 2 ...

Page 42: ...6 EXPLODED VIEWS 6 1 Q1 Q2 VCR MECHANISM SECTON 1 ...

Page 43: ...6 2 Q1 Q2 VCR MECHANISM SECTION 2 ...

Page 44: ...6 3 Q3 VCR MECHANISM SECTION 1 ...

Page 45: ...6 4 Q3 VCR MECHANISM SECTION 2 ...

Page 46: ...3 609 VDG1297 INTERFACE GEAR A 610 VDG1303 A INTERFACE GEAR B 612 VMA9908 PULLEY COVER 613 VMA9916 T4 GUIDE 614 VMA9917 TENSION PLATE 615 VMA0E52 GEAR COVER 616 VHD1430 CAPSTAN HOLDER NV EX3 617 VMC1443 CYLINDER SPRING 618 L6DA8DKC0001 LOADING MOTOR U NV EX1 NV DS77 619 VEM0679 LOADING MOTOR U NV DS99 990 NV DS33 NV EX3 620 VWJ1297 MECHANISM INTERFACE FLEX NV DS99 990 NV DS33 NV EX3 622 K0ZZ000004...

Page 47: ...A9926 CAPSTAN HOLDER NV EX1 NV DS77 NV DS99 990 NV DS33 B601 VHD1155 SCREW B602 VHD1372 SCREW B603 VHD1372 SCREW B604 VHD1372 SCREW B606 VHD1160 SCREW B608 VHD1160 SCREW B609 VHD1406 SCREW B610 VHD1161 SCREW B611 VHD1161 SCREW B612 VHD1161 SCREW B613 VHD1161 SCREW B614 VHD1161 SCREW B615 VHD1162 SCREW B616 VHD1162 SCREW B619 VHD1163 SCREW B621 XQN12 B14FN SCREW Q1 2 3 MECHANISM B622 XQN12 A1 SCREW...

Page 48: ...608 VMX2028 WASHER W609 VMX2028 WASHER W610 VMX2028 WASHER W611 VMX2028 WASHER 7 2 Q1 Q2 VCR MECHANISM SECTION 2 PARTS LIST Ref No Part No Part Name Description Remarks 651 VMD2975 LED HOLDER 652 VXA7407 SUB SHASSIS U Q1 2 3 MECHANISM NV DS99 990 NV DS33 NV EX3 652 VXA6146 SUB SHASSIS U NV EX1 NV DS77 653 VXA6151 COVER PLATE U 654 VXA7408 CASSETTE UP U Q1 2 3 MECHANISM B651 VHD1162 SCREW B652 VHD1...

Page 49: ...504 VDG1285 CENTER GEAR 505 VDG1290 INTERFACE GEAR C 506 VDG1291 INTERFACE GEAR D 507 VDG1330 DECELERATION GEAR A 508 VDG1331 DECELERATION GEAR B 509 VDG1297 INTERFACE GEAR A 510 VDG1303 INTERFACE GEAR B 512 VMA9908 PULLEY COVER 513 VMA9916 T4 GUIDE 514 VMA9917 TENSION PLATE 515 VMA0E52 GEAR COVER 516 VHD1430 CAPSTAN HOLDER 517 VMC1443 CYLINDER SPRING 519 VEM0679 LOADING MOTOR U 520 VWJ1297 MECHAN...

Page 50: ...372 SCREW B503 VHD1372 SCREW B504 VHD1372 SCREW B505 XQN14 B1FN SCREW NV EX21 NV DS68 88 89 25 12 15 150 NV MX2 8 300 1 3 5 7 B506 VHD1160 SCREW B508 VHD1160 SCREW B509 VHD1406 SCREW B510 VHD1161 SCREW B511 VHD1161 SCREW B512 VHD1161 SCREW B513 VHD1161 SCREW B514 VHD1161 SCREW B515 VHD1162 SCREW B516 VHD1162 SCREW B519 VHD1163 SCREW B521 XQN12 B14FN SCREW Q1 2 3 MECHANISM B522 XQN12 A1 SCREW B523 ...

Page 51: ...W511 VMX2028 WASHER 7 4 Q3 VCR MECHANISM SECTION 2 PARTS LIST Ref No Part No Part Name Description Remarks 551 VMD2975 LED HOLDER 552 VXA7407 SUB CHASSIS U Q1 2 3 MECHANISM 553 VXA6151 COVER PLATE U 554 VXA7408 CASSETTE UP U Q1 2 3 MECHANISM B551 VHD1162 SCREW B552 VHD1162 SCREW B553 VHD1162 SCREW B554 VHD1162 SCREW B555 VHD1207 SCREW B556 VHD1164 SCREW B557 VHD1164 SCREW B558 VHD1171 SCREW B559 V...

Reviews: