1) Put Center Gear Spacer on shaft of chassis.
--
2) Put Center Gear on.
16
Pinch Arm & Center Gear
•
3) Make full loading position and put Pinch arm on, then put a washer on.
1) Make unloading position until moving Release Beetle
Confirm spring is exist.
2) Put Sub Chassis Unit on as pre-installation.
3) Tighten 3 screws.
Make Loading position until 1 screw position appears, then tighten a screw.
17
Sub Chassis Unit
--
4) Tighten a screws at Flex Holder portion and Hook spring back to Pinch Arm.
--
1) Put Idler U into shaft of Drive Gear.
2) Put Cover Plate on and tighten 5 screws, then hook 2 springs to 2hooking
portion of Sub chassis.
And also put LED Flat Cable back.
18
LED Holder, Cover plate & Idler U.
--
3) Put LED Holder back.
--
1) Confirm loading and unloading is smooth.
--
2) Put Cylinder Unit & Spring on and tighten 3 screws.
19
Confirmation of Mechanism
movement , Cylinder Unit & RT Flex.
Flame.
--
3) Put RT Flex. Flame on and tighten 2 screws.
1) Put H Amp Unit on and tighten a screw at bottom of chassis.
2) Connect Cylinder Flex to connector.
*20
H Amp Unit.
(Only Q1 & Q2)
--
3) Put Shield case on and tighten a screw.
1) Put both S &T sides to coupling portion on.
21
Cassette Up Unit.
--
2) Tighten 3 screws. (Q1 &2 have 4 screws)* 1)
Procedure 20 for H.Amp Unit is applied only Q1 & Q2
mechanism.
2) Procedure 1 - 3 can be changed in order.
The following parts should be applied Molyton Grease (VFK1024).
Summary of Contents for Mini DV
Page 2: ...1 MECHANICAL PARTS LOCATION 1 1 UPPER SIDE ...
Page 3: ...1 2 BOTTOM SIDE 1 3 SENSOR POSITION ...
Page 6: ...3 DISASSEMBLY PROCEDURE 3 1 PREPARATION FOR DISASSEMBLY ...
Page 9: ...Fig D2 1 Fig D2 2 Fig D2 3 ...
Page 10: ...Fig D3 1 Fig D3 2 Fig D3 3 ...
Page 11: ...Fig D4 1 Fig D4 2 Fig D4 3 ...
Page 12: ...Fig D5 1 Fig D5 2 Fig D6 1 ...
Page 13: ...Fig D6 2 Fig D7 1 Fig D7 2 ...
Page 14: ...Fig D7 3 Fig D8 ...
Page 15: ...Fig D9 Fig D10 Fig D11 Fig D12 Fig D13 ...
Page 16: ...Fig D14 Fig D15 Fig D16 Fig D17 1 ...
Page 17: ...Fig D17 2 Fig D18 1 Fig D18 2 ...
Page 18: ...Fig D19 Fig D20 1 Fig D20 2 ...
Page 19: ...Fig D20 3 Fig D21 ...
Page 23: ...Fig W1 3 Fig W1 4 Fig A1 ...
Page 24: ...Fig A2 1 Fig A2 2 Fig A2 3 ...
Page 25: ...Fig A2 4 Fig A3 Fig A4 ...
Page 26: ...Fig A5 1 Fig A5 2 ...
Page 27: ...Fig A6 Fig A7 Fig A8 ...
Page 28: ...Fig A9 Fig A10 1 Fig A10 2 ...
Page 29: ...Fig A11 Fig A12 Fig A13 ...
Page 30: ...Fig A14 Fig A15 1 Fig A15 2 ...
Page 31: ...Fig A15 3 Fig A16 1 Fig A16 2 ...
Page 32: ...Fig A17 1 Fig A17 2 Fig A17 3 ...
Page 33: ...Fig A17 4 Fig A18 1 Fig A18 2 ...
Page 34: ...Fig A18 3 Fig A19 1 Fig A19 2 ...
Page 35: ...FIg A19 3 Fig A20 1 Fig A20 2 ...
Page 36: ...Fig A20 3 Fig A21 1 Fig A21 2 ...
Page 39: ...Fig AD2 1 Fig AD2 2 Fig AD2 3 Fig AD4 1 Fig AD4 2 ...
Page 40: ...Fig AD5 1 Fig AD5 2 Fig AD6 1 ...
Page 41: ...Fig AD6 2 ...
Page 42: ...6 EXPLODED VIEWS 6 1 Q1 Q2 VCR MECHANISM SECTON 1 ...
Page 43: ...6 2 Q1 Q2 VCR MECHANISM SECTION 2 ...
Page 44: ...6 3 Q3 VCR MECHANISM SECTION 1 ...