Page 3-12
4
. Press
UNLOCK
and Carry in .
• The demand signal is given to the pre-station,
and the board is transferred from the front-
station to the left conveyor.
5
. Press
UNLOCK
and Load .
• The board is transferred from the left conveyor
to the board holder.
6
. Press
UNLOCK
and Unload .
• The board is transferred from the board holder
to the right conveyor.
7
. Press
UNLOCK
and Carry out .
• The board is transferred from the right con-
veyor to the post-station.
• The board at the transfer end position lights as
Carry in
→
Load
→
Unload
→
Carry out during
transferring, and after that, the board at the
transfer start position goes out and is displayed
at the end position.
∗
Repeating the same operation makes a board
transfer error.
Press the emergency button and remove the
board.
8.
Press
.
• The production setting screen reappears.
293C-E-EMA03-A01-01
1
2
3
4
Board Transfer Test
293C-EEn-PcPt-001
5
Summary of Contents for KXF-293C
Page 2: ......
Page 15: ...Page 15 SAFETY PRECAUTIONS Be sure to observe DANGER 293C E EMA00 A03 01 ...
Page 40: ...Page 1 14 293C E EMA01 A01 01 MEMO ...
Page 52: ...Page 2 12 293C E EMA02 A01 01 MEMO ...
Page 80: ...Page 4 16 293C E EMA04 A01 01 MEMO ...
Page 122: ...Page 6 18 293C E EMA06 A01 01 MEMO ...
Page 132: ...Page 7 10 293C E EMA07 A01 01 MEMO ...