25
© Panasonic Corporation 2017
25
1. Log in to the Super Master CS.
・
When IP address of the Super Master CS is unknown, see “Appendix B”.
2. In the [System] tab, select [Tree Survey].
[System] → [Tree Survey]
3. Select an Air Sync Group.
4. Click [Start Tree Survey] and Click [OK] in POP-UP window.
・
After the Tree Survey has completed, results will be displayed and
all CS’s LED become green.
5. Click [OK] in Tree Survey Results window.
・
Click [Tree Image] to see a connection diagram of the CSs
・
If “
Tree Survey Complete
” is not displayed, check the next page.
This step is no need if there is only 1 hop to master.
If the Tree Survey will be conducted for 10 or more CSs, use the CS Maintenance Tool instead.
Tree Survey Results window
Tree Image window
Click [OK]
4.1 Tree Survey -By WEB UI- <Step1> : Tree Survey
ID and Password for
administrator
ID : admin
Password : adminpass
2.
2.
5.
4.
3.