TEST AND MEASUREMENT
Issue 1
Section 6
MCUK001002C8
Revision 0
– 44 –
Service Manual
9.
Perform the following calculation and make a note of the result:
New Trim Value = Old Tri (Required Power - Measured Power) x Change per dB
(step 5)
(table)
(step 2)
(table)
10. At the Channel box, press F6 to program the TRIM for the mid-channel.
Figure 6.16: Power level selection 1
11. Select PROGRAM TRIM PL MCH GSM.
Figure 6.17: Power level selection 2
12. Highlight the PL14 fieldand press ENTER.
Summary of Contents for EB-GD93
Page 4: ...Issue 1 iv MCUK001002C8 Revision 0 Service Manual This page is left intentionally blank ...
Page 73: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 5 8 7 5 06 0DLQ 3 RJLF ...
Page 74: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 0DLQ 3 5 6KHHW RI C A B ...
Page 75: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 0DLQ 3 5 6KHHW RI C A B ...
Page 76: ...CIRCUIT DIAGRAMS MCUK001002C8 Section 8 Issue 1 Service Manual 71 Revision 0 8 4 Keypad PCB ...
Page 77: ......
Page 78: ... 287 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 287 5 06 0DLQ 3 A B C D E F 1 2 3 4 ...
Page 79: ... 287 5 06 VVXH 6HFWLRQ 0 8 5HYLVLRQ 6HUYLFH 0DQXDO H SDG 3 A B C D 1 2 3 4 5 ...