![Panasonic EB-BL600 Service Manual Download Page 80](http://html.mh-extra.com/html/panasonic/eb-bl600/eb-bl600_service-manual_261836080.webp)
7.5.4 Simple Receiver Test
The following procedure gives a method by which the Unit Under Test (UUT) can be placed into a condition
allowing the service technician to probe the entire receive RF path. Input level and frequency can also be specified.
To perform the following procedure the UUT must first be placed into Test Mode. Perform the following steps:
1.
At the Channel box highlight the CHANGE CH field and set the required test channel. Press ENTER.
2.
Highlight the SET AGC 1,2,3 field and enter the required gain value.
3.
At the GSM test unit input an RF signal at the required frequency and level.
The unit has now been placed in a state which will allow the received signal path to be monitored.
7.5.5 Simple Transmitter Test
The following procedure gives a method by which the Unit Under Test (UUT) can be placed into a condition
allowing the service technician to probe the entire transmit RF path. Input level and frequency can also be
specified.
To perform the following procedure the UUT must first be placed into Test Mode. Perform the following steps:
1.
At the Channel box highlight the CHANGE CH field and set the required test channel.
2.
Press ENTER.
3.
Highlight the PL field and set the required test power level.
4.
Press ENTER.
5.
Highlight the TX_DATA field and select the required modulation type and data.
6.
Press ENTER.
The UUT is now in the required state to allow probing of the transmit RF path.
Issue
1
Section 7
MCUK980101C8
Revision 0
7 - 20
Service Manual
TEST AND MEASUREMENT
Summary of Contents for EB-BL600
Page 6: ...This page is intentionally blank Issue 1 vi MCUK980101C8 Revision 0 Service Manual ...
Page 87: ...RF EG70607h MCUK980101C8 Section 8 Issue 1 Service Manual 8 3 Revision 0 CIRCUIT DIAGRAMS ...
Page 88: ...Logic EG70638h Issue 1 Section 8 MCUK980101C8 Revision 0 8 4 Service Manual CIRCUIT DIAGRAMS ...