23
7 Troubleshooting Guide
7.1.
Service and Check Procedures (Air-leak Test)
7.1.1.
Servicing flow
• The following is the servicing procedure including assembly/disassembly process.
• As for the air-leak test, refer to "7.1.3. Air-leak Test".
< Note >
Air-leak test (inspection) before taking service measure:
• When the first inspection, do not perform cleaning (removal of foreign objects caught etc.) of the waterproof packing parts
(battery door and Jack door) from the viewpoint of the cause investigation at NG of test (inspection) result.
• When the test (inspection) result was NG, perform test again after cleaning of waterproof packing parts.
Summary of Contents for DMC-FT5EA
Page 36: ...36 9 Disassembly and Assembly Instructions 9 1 Disassembly Flow Chart 9 2 P C B Location ...
Page 38: ...38 9 3 2 Removal of Rear Aluminum Case Unit Fig D2 9 3 3 Removal of Rear Case Unit Fig D3 ...
Page 44: ...44 9 3 8 Removal of Top FPC Unit Fig D14 9 3 9 Removal of Speaker Fig D15 ...
Page 46: ...46 9 3 12 Removal of MIC G FPC P C B Fig D18 9 3 13 Removal of LCD Unit Fig D19 ...
Page 47: ...47 9 3 14 Removal of Rear Operation FPC P C B Fig D20 Fig D21 ...
Page 56: ...56 ...