
Section
Ground Start and DID Trunks
Guidelines
Chapter 4. Trunks and Lines
l
The following procedure covers ground-start (VB-43531) and DID
43541) installation using the main trunk connector. For instructions on
using the expansion trunk connector, see “Trunk and Line Expansion” on
page 4-43.
l
For
and color codes for the main trunk connector, see Table 4-2 on
.
page 4-5.
l
Each circuit on the ground-start trunk card can be used as either a
start or ground-start trunk. By default, all circuits on the ground-start trunk
are assigned as loop start.
l
The ground-start trunk card requires CPC-B Version 1.0 or higher.
l
The DID card requires CPC-B (Version 2.0 or higher) and SCC-B (Version
1.2 or higher).
l
Both ground start and DID trunks require an external -48V floating output
power supply. The following table shows -48V power consumption for
one- and two-cabinet systems.
Table 4-4. -48V current consumption
for
ground-start and
trunks
System Size
Current Consumption
(Output voltage = 48 4 V
Ripple voltage
One-cabinet system
I
Two-cabinet’system
2Amps
l
The following -48V floating output power supplies have been tested with
DBS ground-start and DID trunks.
Table
-48V power supplies tested with the DBS
Manufacturer
Model Number
Rating
Valcom
VP-2048B
2 Amps
Tellabs
8 l-8002
2 Amps
l
The following “Installation” section includes details on installing the
power supply.
DBS-70-300
DBS Manual Issued
4-9
Summary of Contents for DBS 96
Page 10: ...List of Tables Section 300 installation X DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 13: ...1 2 DES Manual Revised 4 3 96 DES 70 300 ...
Page 19: ...DES Manual Issued 8 l 95 DES 70 300 ...
Page 28: ...3 2 DBS Manual Issued 8 l 95 DES 70 300 ...
Page 47: ...4 2 DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 91: ...5 2 DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 127: ...6 2 DBS Manual Issued 8 l 95 DBS 70 300 ...