9.3. Evacuation (Installation)
(No refrigerant in the refrigeration cycle)
Procedure
1. Connect the vacuum pump to the charge set´s centre hose.
2. Evacuation for approximately 1 hour.
•
•
•
•
Confirm that the gauge needle has moved toward-76cmHg (-0.1Mpa) [vacuum of 4 mmHg or less].
3. Close the valve (low side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle dose not move
(approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum.
•
•
•
•
Vacuum oil
If the vacuum pump oil becomes dirty or depleted, replenish as needed.
45
CS-SA9CKP CU-SA9CKP5 / CS-SA12CKP CU-SA12CKP5
Summary of Contents for CS-SA9CKP
Page 9: ...3 Dimensions 9 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 10: ...10 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 11: ...4 Refrigeration Cycle Diagram 11 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 12: ...5 Block Diagram 12 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 13: ...6 Wiring Diagram 13 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 17: ...Time Graph for soft dry operation 17 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 26: ...26 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 55: ...13 Exploded View CS SA9CKP CS SA12CKP 55 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 57: ...15 Exploded View CU SA9CKP5 CU SA12CKP5 57 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...
Page 61: ...17 1 REMOTE CONTROL 61 CS SA9CKP CU SA9CKP5 CS SA12CKP CU SA12CKP5...