![Panasonic CS-E24DKE Service Manual Download Page 66](http://html.mh-extra.com/html/panasonic/cs-e24dke/cs-e24dke_service-manual_256896066.webp)
11.3.4. EVACUATION OF THE EQUIPMENT (FOR EUROPE & OCEANIA DESTINATION)
WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the
following procedure.
1. Connect a charging hose with a push pin to the Low and High side of a charging set and the service port of the 3-way valve.
•
Be sure to connect the end of the charging hose with the push pin to the service port.
2. Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and vacuum pump adaptor.
3. Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 cmHg (0 MPa) to
-76 cmHg (-0.1 MPa). Then evacuate the air approximately ten minutes.
4. Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the gauge does not
move after approximately five minutes.
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5. Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.
6. Tighten the service port caps of the 3-way valve at torque of 18 N.m with a torque wrench.
7. Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN” using a hexagonal
wrench (4 mm).
8. Mount valve caps onto the 2-way valve and the 3-way valve.
•
Be sure to check for gas leakage.
CAUTION
•
If gauge needle does not move from 0 cmHg (0 MPa) to -76 cmHg (-0.1 MPa), in step 3 above take the following measure:
•
If the leak stops when the piping connections are tightened further, continue working from step 3.
•
If the leak does not stop when the connections are retightened, repair the location of leak.
•
Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause
frostbite.
11.3.5. CONNECT THE CABLE TO THE OUTDOOR UNIT
1. Remove the control board cover from the unit by loosening the screw.
2. Connecting cable between indoor unit and outdoor unit shall be approved polychloroprene sheathed 4 × 2.5 mm
2
flexible cord,
type designation 245 IEC 57 or heavier cord.
3. Secure the cable onto the control board with the holder (clamper).
4. Attach the control board cover back to the original position with the screw.
66
CS-E24DKE CU-E24DKE
Summary of Contents for CS-E24DKE
Page 9: ...4 Dimensions 4 1 Indoor Unit Remote Control 9 CS E24DKE CU E24DKE ...
Page 10: ...4 2 Outdoor Unit 10 CS E24DKE CU E24DKE ...
Page 11: ...5 Refrigeration Cycle Diagram 11 CS E24DKE CU E24DKE ...
Page 12: ...6 Block Diagram 12 CS E24DKE CU E24DKE ...
Page 13: ...7 Wiring Diagram 13 CS E24DKE CU E24DKE ...
Page 77: ...13 Technical Data 77 CS E24DKE CU E24DKE ...
Page 89: ...89 CS E24DKE CU E24DKE ...
Page 91: ...18 3 Remote Control 91 CS E24DKE CU E24DKE ...
Page 92: ...18 4 Print Pattern Indoor Unit Printed Circuit Board 92 CS E24DKE CU E24DKE ...
Page 94: ......