![Pamex Kapture KA-WR1N User Manual & Implementation Manual Download Page 48](http://html.mh-extra.com/html/pamex/kapture-ka-wr1n/kapture-ka-wr1n_user-manual-and-implementation-manual_750277048.webp)
47
Implementation Guide
Concepts
Depending on the progress of your project, there are three phases defined as :
●
Construction Phase :
All the door locks are installed but not programmed yet. MF-Admin
server is not necessary in this phase.
●
Lock Registration Phase :
The door locks are ready to be programmed/registered to MF-Admin
server.
●
Go-Live Phase :
All the locks are registered to MF-Admin Server. The system is ready
to go.
Normally, as time goes by, a project will first in construction phase, then go to lock
registration phase, then go-live phase. Each phase requires different tasks to be
completed as described below.
In this guide, we will use the term Card or Key from time to time. Both term refers to the
Mifare Card or Mifare key fob in issued by Pamex Kapture solution.
MP100 is the only device you use to issue card/key. Note that sometimes you have to
re-place (take card off the reader then place the card on the reader again) the card on
the reader to successfully complete your card operation. MF-Admin server will remind
you to re-place the card as possible as it can. But remember to do so when you
encounter MP100 reader error. It’s not a bug but the nature of Mifare Card operations.
Summary of Contents for Kapture KA-WR1N
Page 10: ...9 Front View Figure 3 Kapture KA WR1S Front Kapture KA WR1N Front ...
Page 11: ...10 Back View Figure 4 Kapture KA WR1S Back Kapture KA WR1N Back ...
Page 13: ...12 Basic Door Installation Figure 6 Kapture KA WR1S N Basic Door Installation ...
Page 14: ...13 Basic Door Installation Wiring Figure 7 Kapture KA WR1S N Basic Door Installation Wiring ...
Page 15: ...14 Solid State Output Figure 8 Kapture KA WR1S N Solid State Output ...
Page 16: ...15 Surface Mounting Figure 9 Kapture KA WR1S N Surface Mounting ...
Page 18: ...17 Dimensions Figure 11 Kapture KA WR1S Front Figure 12 Kapture KA WR1N Front ...
Page 19: ...18 Back Figure 13 Kapture KA WR1S Back ...
Page 20: ...19 Figure 14 Kapture KA WR1N Back ...
Page 27: ...26 Product Photo Mark ...
Page 28: ...27 Dimensions 內外機 Mark ...
Page 29: ...28 Installation Guide ...
Page 32: ...31 Product Photo Mark ...
Page 33: ...32 Dimensions 內外機 Mark ...
Page 34: ...33 Installation Guide D1 Installation Guide ...
Page 37: ...36 Product Photo Mark ...
Page 38: ...37 Dimensions 內外機 Mark ...
Page 39: ...38 Installation Guide ...
Page 42: ...41 Product Photo Mark ...
Page 43: ...42 Installation Guide ...
Page 46: ...45 Product Photo Mark ...
Page 47: ...46 Installation Guide ...
Page 63: ...62 Place key card on reader first Click Read Key From Reader to get Key s UID ...
Page 81: ...80 Place key card on reader first Click Read Key From Reader to get Key s UID ...
Page 91: ...90 Check the box on Group Area M and click time control button to edit ...
Page 93: ...92 Click Issue Write Key to issue the vendor key Place key card on reader first ...
Page 99: ...98 Place key card on reader first Click Read Key From Reader to get Key s UID ...
Page 118: ...117 Factory default settings Deadbolt Same as Wall Reader ...
Page 119: ...118 Factory default settings Leverset Same as Wall Reader ...
Page 120: ...119 Factory default settings Interconnect Same as Wall Reader ...