background image

Inspection Certificate 

Controlecertificaat 

● Kontrollschein ● Bulletin de contrôle ●  Certificato di 

controllo  

● Certificado de control ● Kontrollskjema ● Kontrol Certifikat ● 

Tarkastustodistus 

● Besiktningsprotokoll ● Kontrolní certifikát ● Pārbaudes 

akts 

● Apžiūros pažyma ● Certyfikat kontrolny ● Certificado de Inspeção 

● Kontrollakt 
  

 

Please keep safely! 

Zorgvuldig te bewaren! 

● Bitte gut aufbewahren! ● A bien conserver, s.v.p.! ● 

Da conservare! 

● ¡A conservar! ● Ta vare på denne! ● Opbevares sikkert! ● 

Ole hyvä ja säilytä huolella! ● Vänligen förvara säkert! ● Prosím, pečlivě 
uschovejte! 

● Lūdzu, glabājiet drošā vietā! ● Laikykite saugiai! ● 

Prz

echowywać w bezpiecznym miejscu! ● Por favor, guarde em segurança!  

● Palun säilitada hoolsalt!   

 

          Art. Nr. PA28-3030-1 

 

 

English:

  The  product  you  have  purchased  was  manufactured  in  accordance  with  the  high  quality  norms.  The  product  unit  has  been 

carefully inspected and packed. In order to avoid possible problems during the assembly carried out by yourself or the building company of 
your choice, we recommend that you inspect the delivery for its completeness in accordance with the list of pieces before assembly. This 
inspection  must  be  carried  out  within  14  days  after  delivery  to  your  place.  Warranty  claims  are  limited  to  the  exchange  of  defective 
materials.  Defective  product  parts,  which  have  already  been  used  or  painted,  are  excluded  from  being  replaced.  All  further  claims  are 
excluded! In cases of complaints, please pay attention to the following procedures: Please present this inspection certificate along with the 
sales receipt to your place of purchase. Only in cases where these documents are presented will the complaint be dealt with quickly and 
without complications. 

Dutch

: Het door U gekochte product werd vervaardigd overeenkomstig hoge kwaliteitsnormen. Het product werd zorgvuldig gecontroleerd 

en  verpakt.  Om  tijdens  de montage, uitgevoerd  door  Uzelf of  een  door  U gekozen  aannemer,  problemen  te  vermijden,  raden  we  U a an, 
vóór de montage de levering te controleren op volledigheid in overeenstemming met de onderdelenlijst. Deze controle dient te gebeuren 
binnen 14 dagen na levering bij U thuis. Garantieclaims zijn beperkt tot het vervangen van defecte onderdelen. Defecte onderdelen die al 
gebruikt  of  geschilderd  zijn,  zijn  uitgesloten  van  vervanging.  Alle  latere  claims  zijn  uitgesloten!  In  geval  van  klachten  dient  u  als  volgt  te 
handelen:  Toon  dit  controlecertificaat,  samen  met  Uw  aankoopbewijs  aan  Uw  verkoper.  Alleen  wanneer  deze  documenten  getoond 
worden, zal de klacht snel en zonder complicaties in behandeling worden genomen.

 

Deutsch:

 

Der von Ihnen gekaufte Artikel wurde nach der hohen Qualitätsnorm gefertigt. Der Bausatz wurde sorgfältig geprüft und verpackt. 

Um  etwaige  auftretende  Pr

obleme  während  des  Aufbaus  durch  Sie  oder  Ihre  Aufbaufirma  zu  vermeiden,  kontrollieren  Sie  bitte  die 

Lieferung auf Vollständigkeit laut Stückliste vor dem Aufbau. Diese Kontrolle muss innerhalb 14 Tagen nach Anlieferung bei Ihnen erfolgen. 
Ansprüche auf Gewährleistung beschränken sich auf den Austausch von fehlerhaftem Material. Fehlerhafte Bauteile, die bereits verbaut 
oder  gestrichen  wurden,  sind  vom  Umtausch  ausgeschlossen.  Alle  weiteren  Ansprüche  sind  ausgeschlossen!  Sollte  es  zu  einer 
Beanstandung komm

en, beachten Sie folgende Vorgehensweise: Legen Sie Ihrem Fachhändler diesen Kontrollschein zusammen mit dem 

Einkaufsbeleg vor. Nur bei Vorlage dieser Unterlagen ist eine schnelle und problemlose Bearbeitung Ihrer Beanstandung möglich. 

Français:

 Le produi

t que vous venez d’acheter a été fabriqué en respectant de hautes normes de qualité. Ce produit a été testé et emballé 

avec soin. Afin d’éviter des problèmes éventuels pendant la construction par vous-même ou par la société de construction mandatée, nous 
v

ous  prions  de  bien  vouloir  vérifier  que  toutes  les  pièces  ont  été  fournies  selon  la  liste  des  pièces  avant  que  vous  ne  commenciez  la 

construction. Il vous incombe de faire ce contrôle dans les 14 jours après la fourniture. Les revendications en dédommagement se limitent 
à  l’échange  de  matériel  défectueux.  Les  pièces  défectueuses,  déjà  construites  ou  peintes,  ne  font  pas  l’objet  de  l’échange.  Toutes  les 
revendications  ultérieures  ne  sont  pas  prises  en  compte  ! En  cas  d’une  réclamation,  veuillez  respecter  le  déroulement  suivant  :  il  vous 
faudra présenter à votre commerçant agréé ce bulletin de contrôle avec le récépissé de l’achat. Ce ne sera que moyennant présentation de 
ces documents qu’un traitement rapide et sans problème de votre réclamation sera possible! 

Italiano:

 Il prodotto 

che avete acquistato è stata prodotta secondo la norma di alta qualità. Il kit è stato controllato ed imballato con cura. 

Per evitare eventuali inconvenienti durante il montaggio, si prega di verificare, prima del montaggio, la completezza della fornitura in base 
alla  distinta  dei  pezzi.  Tale  verifica  deve  essere  effettuata  entro  14  giorni  dalla  consegna.  Eventuali  diritti  di  garanzia  si  limitano  alla 
sostituzione di materiale difettoso. Gli elementi difettosi già montati o verniciati sono esclusi dal diritto alla sostituzione. Ogni altro diritto 
resta  escluso!  In  caso  di  reclamazione,  procedere  nel  modo  seguente:  presentare  questo  certificato  di  controllo  unitamente  alla  prova 
d’acquisto al rivenditore. Solo in questo modo la Sua reclamazione potrà essere evasa rapidamente e senza problemi. 

Español: 

El  producto  que  ha  adquirido  ha  sido  fabricada  de  acuerdo  con  normas  de  alta  calidad.  Las  piezas  del  producto  han  sido 

cuidadosamente  inspeccionadas  y  embaladas.  Con  el  fin  de  evitar  posibles  problemas  durante  el  montaje,  hecho  por  usted  o  por  la 
empresa  de  construcción  de  su  elección,  le  recomendamos  revisar  el  paquete  entregado,  con  la  lista  de  piezas,  antes  de  armar  el 
producto. Haga la revisión dentro de 14 días después de recibir el paquete. La garantía se limita a reemplazar las piezas defectuosas. No 
se reemplazarán las partes defectuosas que ya hayan sido utilizadas o pintadas. ¡No se aceptan otras reclamaciones! En casos de queja, 
por favor, presente este certificado junto con la factura en el lugar dond

e hizo la compra. Sólo presentando estos documentos podremos 

resolver su problema rápidamente y sin complicaciones. 

Norsk:

 

Produktet  du  har  kjøpt,  ble  produsert  i  henhold  til  høye  kvalitetskrav.  Produktet  har  blitt kontrollert  nøye  og  deretter  omhyggelig 

pakket.  For  å  unngå  mulige  problemer  under  monteringen,  uansett  om  du  gjør  det  selv  eller  får  en  godkjent  håndverker  til  å  gjøre  det, 
anbefaler vi at du kontrollerer leveransen mot delelisten for å se om alle delene er inkludert. Denne kontrollen må gjøres innen 14 dager 
etter at delene ble levert til din adresse. Garantikrav begrenser seg til bytte av defekte deler. Defekte elementer som allerede har blitt brukt 
eller malt/beiset/limt, vil ikke bli erstattet. Alle andre krav er utelukket! Dersom du har en 

reklamasjon, vennligst gjør som følger: Lever dette 

kontrollskjema  med  kvitteringen  til  salgsstedet.  Bare  når  du  har  med  disse  dokumentene  kan  klagen  behandles  raskt  og  uten 
komplikasjoner.

 

Dansk: 

Det købte produkt  fremstillet i overensstemmelse med de høje kvalitets krav. Produktet er blevet omhyggeligt inspiceret og pakket. 

For at undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg, anbefaler vi, at du undersøger 
leverancen for fuldstændighed i overensstemmelse med listen over dele før samling. Denne inspektion skal foretages inden 14 dage efter 
levering til din plads. Garantikrav er begrænset til udveksling af defekte materialer. Defekte produkter, som allerede er brugt eller malet, er 
udelukket  fra  at 

blive  erstattet.  Alle  yderligere  krav  er  udelukket!  I  tilfælde  af klager,  skal du  være  opmærksom  på  følgende procedurer: 

Venligst  præsentere  denne  kontrol  certifikat  sammen  med  kvitteringen  til  det  sted  hvor  produktet  er  købt.  Kun  i  de  tilfælde,  hvor  disse 
dokumenter er forelagt kan klagen behandles hurtigt og uden komplikationer. 

Suomi:

  Ostamasi  tuote  on  valmistettu  korkeita  laatuvaatimuksia  noudattaen,  huolella  tarkastettu  ja  pakattu.  Jotta  pystytys  joko  itsesi  tai 

valitsemasi  rakennusliikkeen  toimesta  sujuisi  ongelmitta,  suosittelemme,  että  tarkistat  toimituksen  sisällön  osaluettelon  avulla  ennen 
kokoamisen  aloittamista.  Tämä  tarkistus  tulee  tehdä  14  päivän  kuluessa  toimituksesta.  Takuuvaateet  rajoittuvat  viallisten  materiaalien 
vaihtamiseen.  Viallisia  osia,  joita  on  jo  käytetty  ja  jotka  on  maalattu,  ei  vaihdeta  uusiin.  Lisävaatimuksia  ei  huomioida!  Mahdollisissa 
valitustapauksissa toimi seuraavasti: Esitä oheinen tarkastustodistus ja kassakuitti ostopaikassa. Valituksen nopea ja mutkaton  

Summary of Contents for PA28-3030-1

Page 1: ...pte En cas d une r clamation veuillez respecter le d roulement suivant il vous faudra pr senter votre commer ant agr ce bulletin de contr le avec le r c piss de l achat Ce ne sera que moyennant pr sen...

Page 2: ...ite pristatyti ap i ros pa ym jim bei pirkimo kvit Tik tais atvejais kai pristatomi min ti dokumentai pretenzija gali b ti nagrin jama greitai ir be komplikacij Polski Produkt kt ry Pa stwo zakupili w...

Page 3: ...r Ostja aadress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Telefon T lrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhal...

Page 4: ...n Producent zastrzega sobie prawo do dokonywania zmian technicznych produktu Tootja j tab endale iguse muuta toote tehnilisi omadusi Installation manual Montageanleitung Notice de montage Istruzioni p...

Page 5: ...6 8 m 2 322 322 280 280...

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 18: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 19: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 20: ...er that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the app...

Page 21: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Page 22: ...ns and on the walls Start placing the roof boards with the longest board from the bottom Put the groove side downwards that the bottom side of the board will meet the ends of the rafters It is recomme...

Page 23: ...to wood swelling or diminishing ADVICE Make sure that the storm braces are attached to the apex log from above and to the middle of the first full length wall log from below If necessary shorten the...

Page 24: ...trollnummer des Hauses Es ist m glich die Reklamation nur dann als Garantiefall zu behandeln wenn Sie die Kontrollnummer Ihrem Fachh ndler weitergeben Abweichungen die keinen Reklamationsgrund darstel...

Page 25: ...r wichtig sowohl die Innen als auch die Aussenseiten der T ren und Fenster auf einmal zu streichen Andernfalls k nnen sie sich verziehen Nach dem Aufbau empfehlen wir Ihnen die Aussenhaut ohne Dach zu...

Page 26: ...Fundamentvorschl ge Streifen oder Punktfundament Beton bzw Gehwegplattenfundament gesch ttetes Betonfundament Bereiten Sie das Fundament so vor dass die Lagerh lzer berall im Abstand von max 50 60 cm...

Page 27: ...Hammer direkt auf die Feder schlagen Die Wandpl ne Siehe Technische Daten zeigen Ihnen den Aufbau der W nde Als erstes verlegen Sie die halben Bohlen der Vorder und R ckwand und befestigen Sie sie mit...

Page 28: ...hren Sie fort die W nde hochzuziehen bis Sie zur Fensterh he gelangen Aus den Wandpl nen siehe Technische Daten wird ersichtlich wie viele Bohlen unter den Fenstern sind Beim Einsetzen der Fenster ver...

Page 29: ...Dachpfetten und auf die W nden befestigen Die Verlegung der Dachbretter mit den l ngsten und untersten Bohlen anfangen Die Feder Seite nach unten und so dass die untere Seite des Bohles mit der Enden...

Page 30: ...mit dem Arbeiten des Holzes g be HINWEIS Beachten Sie dass die Sturmleisten oben an die Giebelbohle und unten in der Mitte der ersten ganzen Wandbohle befestigt werden Beim Bedarf schneiden Sie die L...

Page 31: ...e peut tre trait e dans le cadre de la garantie que si vous communiquez le num ro de contr le votre revendeur sp cialis Ecarts qui ne constituent pas un motif de r clamation Le bois est un produit nat...

Page 32: ...l est tr s important de peindre en une seule fois aussi bien les faces int rieures que les faces ext rieures des portes et des fen tres Dans le cas contraire elles pourront se d former Une fois le mon...

Page 33: ...ment ventil e par dessous Nous vous proposons les fondations suivantes Semelle filante ou fondations ponctuelles Fondations en b ton ou fondations en dalles de ciment Fondations coul es en b ton Pr pa...

Page 34: ...oujours ressort tourn vers le haut En cas de besoin utilisez la planche frapper et le marteau Ne jamais frapper directement sur le ressort avec le marteau Les plans des parois voir partie Caract risti...

Page 35: ...des fen tres Continuez monter les parois jusqu ce que vous arriviez la hauteur des fen tres Les plans des parois voir Caract ristiques techniques vous indiquent combien il y a de madriers sous les fen...

Page 36: ...la toiture commencez par la planche la plus longue da la partie inf rieure Installez la planche de fa on que le c t rainur soit vers le bas et que la face inf rieure de la planche r unisse les extr m...

Page 37: ...qu il n y ait pas plus tard de probl mes avec le travail du bois REMARQUE Veillez fixer les contreventements en haut sur le madrier du pignon et en bas au centre du premier madrier de paroi complet En...

Page 38: ...la documentazione Sul certificato di controllo riportato il numero di controllo della casa Reclami possono essere evasi in garanzia unicamente se comunicherete il numero di controllo al vostro negozi...

Page 39: ...re con un colore di fondo E molto importante verniciare sia il lato interno che quello esterno delle porte in un unica soluzione altrimenti potrebbero deformarsi Dopo il montaggio consigliamo di appli...

Page 40: ...eglio dall umidit Ricordate inoltre che la casetta deve essere sufficientemente ventilata Nostri consigli per le fondamenta Fondamenta a strisce o punti Fondamenta in calcestruzzo risp fondamenta con...

Page 41: ...chio verso l alto Se necessario usare il blocchetto di legno ed il martello Non battere mai con il martello direttamente sul maschio Gli schemi delle pareti vedi parte Dati Tecnici illustrano il monta...

Page 42: ...pareti fino a raggiungere l altezza delle finestra Dagli schemi della parete vedi Dati Tecnici risulta quante tavole si trovano sotto le finestre Per inserire le finestre procedere esattamente come p...

Page 43: ...listelli profilo ad U tra gli arcarecci e le pareti Comincia a collocare le tavole del tetto colla tavola pi lunga nella parte inferiore Colloca il lato della scanalatura verso il basso in modo che il...

Page 44: ...listelli antivento vengano fissati in alto sulla tavola del timpano e sotto nel centro della prima tavola parete intera Al bisogno accorciare i listelli dalla parte superiore Le viti a testa quadra de...

Page 45: ...olamente si usted suministra al vendedor el n mero de control de su casita de madera La garant a no cubre Caracter sticas peculiares de la madera derivadas de la misma como un material natural Element...

Page 46: ...como por fuera de las superficies de las puertas y ventanas En caso contrario se pueden desarrollar deformaciones Despu s del ensamblaje de la caba a recomendamos para su acabado el uso de pintura re...

Page 47: ...ormig n in situ Construya la cimentaci n de modo tal que las vigas de la cimentaci n est n debidamente apoyadas y que la distancia entre los puntos de apoyo sea por lo menos de 50 60 cm Buscar el ases...

Page 48: ...r datos t cnicos En primer lugar ponga los elementos parcialmente preparados de las paredes delanteras y traseras en su lugar y f jelos con tornillos a las vigas de cimentaci n Luego coloque las vigas...

Page 49: ...e las ventanas Los esquemas de la pared ver datos t cnicos le mostrar n la cantidad de los elementos que se colocan debajo de las ventanas Instale las ventanas en la manera en que se describe la insta...

Page 50: ...jado no incluido Es necesario para evitar la protuberancia de las tablas de tejado debido a la humedad Suelo Los suelos se colocan s lo despu s de que la casa ha sido totalmente montada lo que impide...

Page 51: ...la instalaci n del edificio hay que ajustar las fijaciones para que los elementos de la pared puedan asentarse hacia abajo tambi n Instalaci n de los tableros de acceso Recomendaciones generales Probl...

Page 52: ...n behandelen indien U het controlenummer aan Uw verkoper bezorgt De garantie dekt niet Eigenaardigheden van hout als natuurlijk materiaal Houten reeds geschilderde delen behandeld met een houtbescherm...

Page 53: ...el aan de binnen als aan de buitenkant Anders kunnen ze verwrongen geraken Nadat het tuinhuis volledig is geassembleerd bevelen we als finale afwerking het aanbrengen van een dekkende verf aan die het...

Page 54: ...g zo dat de bovenkant minstens 5 cm uit de grond steekt Verzeker er U van dat er onder de vloer voldoende luchtopeningen voor ventilatie zijn Wij bevelen de volgende funderingsopties aan Strip of spot...

Page 55: ...ngsbalken Wanden Bij het monteren van de muren is het belangrijk erop te letten dat De balken steeds met de tong naar boven worden gemonteerd U indien nodig de slagblokken en de hamer gebruikt Sla noo...

Page 56: ...ntageplan zie Technische speificaties geeft aan hoeveel balken er onder het raam zitten Monteer het raam zoals de deur druk net als bij de deur de raamkozijn krachtig in de raamopening tot op de onder...

Page 57: ...komt met de balken Het is aangeraden de dakbalken gelijktijdig te plaatsen aan alle zijden van het dak Bevestig de dakplanken op de balken met 2x5x50mm nagels Na het bevestigen van de dakplanken bedek...

Page 58: ...bovenste uiteinden van de latten in Draai de schroeven niet te vast zodat het hout verder kan uitzetten en krimpen Na het tuinhuis te hebben gemonteerd past U best de toevoegingen aan zodat de muurbal...

Reviews: