background image

Installation manual 

 

 
 

 

Apex 

In  most  cases,  the  apex  is  supplied  in  one  piece  (attention:  in  some  house  options,  the  apex  can 
comprise  several  parts!  In  this  case,  these  parts  will  have  to  be  screwed  together  prior  to  other 
actions).  Having  installed  the  last  wall  logs,  place  the  apex  on  the  front  and  back  walls  and  attach 
them with screws.  

The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring 
that the roof is placed firmly and in the right place. 

Now  place  the  purlins  in  the 
corresponding 

indents 

in 

the 

apexes.  

Make  sure  that  the  upper  wall  log, 
apexes  and  purlins  are  level. 
Having  fitted  the  purlins,  screw 
them onto the apex from above. 

 

 Installation of purlins: 

 

 

ATTENTION

: If the wall logs are not properly pressed on top of one another without gaps, the upper 

wall  log  may  not  be  on  the  same  level  with  the  apexes.  In  this  case  you  should  tap  the  wall  logs 
downwards as necessary or plane the apex or sidewall log somewhat lower.  

 

Roof 

Before installing the roof boards, make sure that the house is completely level. Use the water-level to 
check all walls. 

ATTENTION

: When placing the roof, use a stable  ladder. Do not step on the roof as the structure is 

suitable to sustain only an even load (snow, wind, etc.), and not a point load! 

Begin the installation of the roof boards 

from the front edge of the roof

. Tap the boards lightly and 

attach them from above and below with nails to the purlins and upper wall log.  

ATTENTION

: Do not press the roof boards together too densely and  you will avoid moisture-causing 

bulging! Leave an interval of about 1 mm between the boards to allow for swelling. 

 

During the whole process of installing the roof boards, make sure that their crest  purlins coincide 
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral 
eave lath that you may install for verification purposes.  

 

The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last 
roof boards so narrow that they are even with the purlin ends.  

Summary of Contents for FR34-3857-1

Page 1: ...pte En cas d une r clamation veuillez respecter le d roulement suivant il vous faudra pr senter votre commer ant agr ce bulletin de contr le avec le r c piss de l achat Ce ne sera que moyennant pr sen...

Page 2: ...ite pristatyti ap i ros pa ym jim bei pirkimo kvit Tik tais atvejais kai pristatomi min ti dokumentai pretenzija gali b ti nagrin jama greitai ir be komplikacij Polski Produkt kt ry Pa stwo zakupili w...

Page 3: ...r Ostja aadress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Telefon T lrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhal...

Page 4: ...ie prawo do dokonywania zmian technicznych produktu Tootja j tab endale iguse muuta toote tehnilisi omadusi Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de...

Page 5: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pa...

Page 6: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 7: ...ndation so that its upper edge extends from the ground to a height of at least 5 cm At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommen...

Page 8: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 9: ...he leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height...

Page 10: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 11: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 12: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...1000mm 13x 2100mm 3x 6020 2100 2100 140 2100 140 1000 1000 1000 2 5...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Reviews: