Palmako FR34-3857-1 Installation Manual Download Page 6

Installation manual 

 

 
 

 

 Garden house painting and maintenance 

Wood is a natural material, growing and adapting depending on weather conditions. Large and small 
cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, 
but a result of wood growing and a peculiarity of wood as a natural material.  
 
Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for 
a while, and can be turn blue and become mouldy. To protect the wooden details of your garden 
house, you must immediately process them with a wood preservative.  
 
We recommend that you cover the floor boards in advance with a colourless wood impregnation 
agent, especially the bottom sides of the boards, to which you will no longer have access when the 
house is assembled. Only this will prevent moisture penetration. 

 

We definitely recommend that you also process the doors and windows with a wood impregnation 
agent, and do that namely both inside and outside! Otherwise the doors and windows can become 
twisted.  

After  the  house  assembly  is  completed,  we  recommend  for  the  conclusive  finishing  a  weather 
protection paint that will protect wood from moisture and UV radiation.  

When  painting,  use  high  quality  tools  and  paints,  follow  the  paint  application  manual  and 
manufacturer’s  safety  and  usage  instructions.  Never  paint  a  surface  in  strong  sunlight  or  rainy 
weather. Consult a specialist regarding paints suitable for unprocessed softwood and follow the paint 
manufacturer’s instructions.  

Having been properly painted, your garden house’s lifetime will increase substantially. We recommend 
that you inspect the house thoroughly once every six months.  

 

2  Preparation for assembly 

 

Tools and preparation of components 

To assemble the garden house, you will need the following tools: 

 assembly aid 

 water-level 

 

knife 

 

 

ladder 

 screwdriver 

 measuring tape 

  

 

 hammer  

 

saw 

 pliers 

 drill

 

 

ADVICE:

 To avoid splinters, we recommend that you wear the corresponding protective gloves during 

the assembly process. 

Summary of Contents for FR34-3857-1

Page 1: ...pte En cas d une r clamation veuillez respecter le d roulement suivant il vous faudra pr senter votre commer ant agr ce bulletin de contr le avec le r c piss de l achat Ce ne sera que moyennant pr sen...

Page 2: ...ite pristatyti ap i ros pa ym jim bei pirkimo kvit Tik tais atvejais kai pristatomi min ti dokumentai pretenzija gali b ti nagrin jama greitai ir be komplikacij Polski Produkt kt ry Pa stwo zakupili w...

Page 3: ...r Ostja aadress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Telefon T lrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhal...

Page 4: ...ie prawo do dokonywania zmian technicznych produktu Tootja j tab endale iguse muuta toote tehnilisi omadusi Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de...

Page 5: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pa...

Page 6: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 7: ...ndation so that its upper edge extends from the ground to a height of at least 5 cm At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommen...

Page 8: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 9: ...he leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height...

Page 10: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 11: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 12: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...1000mm 13x 2100mm 3x 6020 2100 2100 140 2100 140 1000 1000 1000 2 5...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Reviews: