background image

Installation manual 

 

 
 

 

Continue  the  installation  of  the  walls  by  strongly  forcing  the  wall  logs  into  one  another.  If  necessary, 
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 
and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

Door and window 

Doorframe: 

  If  it  is  a  double  door,  the 

doorframe 

is 

supplied 

in 

separate 

parts 

due 

to 

transportation  requirements  and 
you  will  have  to  begin  by 
assembling it.  

  To  do  this,  place  together  the  4 

parts  of  the  frame  and  screw 
them onto one another.  

  Make  sure  that  the  part  of  the 

frame  with  the  deeper  notch  is 
installed  upwards.  The  lateral 
jamb  parts  have  hinges  and  are 
mirrored.  

  It  is  recommended  to  install  the 

leaves later.  

  If it is a single door, its frame and 

leaf 

are 

supplied 

already 

assembled. 

 Doorframe installation (Only necessary for a double door!): 

 

 

Door installation: 

The  doorframe  is  placed  at  the 
formed  aperture  and  pushed  with 
force  onto  the  lower  log.  If  it  is  a 
double door, place  the leaves on the 
hinges  now.  To  open  and  close  the 
door, fit the separately packaged lock 
and handle.  

 

 

 

Window installation: 

Continue  with the  installation  of the  wall  logs until  you reach the  window height. The  wall plans (see 
Technical specifications) show how many  logs go under the window. Install the window  similarly with 
the door. Just like the door, push the window frame with the window into the window aperture onto the 
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).  

ADVICE

:  Definitely  make  sure  that  the  windows  and  doors  open  in  the  proper  direction.  The  doors 

always open from the inside 

to the outside

. The tilt&turn windows open 

to the inside

. The revolving 

and the slinging windows open 

to the outside

 (the window handles are on the inside). 

ATTENTION

: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it 

will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, 
the wall logs will begin subsiding.  

You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house 
installation, when the house will have become adapted to weather conditions and its logs settled.  

 

Summary of Contents for FR34-3857-1

Page 1: ...pte En cas d une r clamation veuillez respecter le d roulement suivant il vous faudra pr senter votre commer ant agr ce bulletin de contr le avec le r c piss de l achat Ce ne sera que moyennant pr sen...

Page 2: ...ite pristatyti ap i ros pa ym jim bei pirkimo kvit Tik tais atvejais kai pristatomi min ti dokumentai pretenzija gali b ti nagrin jama greitai ir be komplikacij Polski Produkt kt ry Pa stwo zakupili w...

Page 3: ...r Ostja aadress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Telefon T lrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhal...

Page 4: ...ie prawo do dokonywania zmian technicznych produktu Tootja j tab endale iguse muuta toote tehnilisi omadusi Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de...

Page 5: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pa...

Page 6: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 7: ...ndation so that its upper edge extends from the ground to a height of at least 5 cm At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommen...

Page 8: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 9: ...he leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height...

Page 10: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 11: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 12: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...1000mm 13x 2100mm 3x 6020 2100 2100 140 2100 140 1000 1000 1000 2 5...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Reviews: