Water treatment
system’s operating water tempe-
rature is between minimum
5˚C (41˚F) and maxi-
mum
40˚C (104˚F). It has risk of freezing to operate
the device below
5˚C as it carries risk of damage to
filters when operated at above
40˚C.
It is necessary to select a suitable location first for
installation of water treatment device. It must be
considered during selection that installation place
should be close to cold water line of the RO device
and to the drainage and sufficient space should be
left for working in case of malfunction and filter
replacement.
Water treatment device is designed for water with
specifications close to tap water, whose inlet con-
ductivity is max. 600 ppm and the turbidity is max
3 NTU. If raw water source and specifications are
unknown, the raw water should be sent for analysis
before installation of the device in order to check
the suitability.
If the device is used beyond the limit values men-
tioned in technical specification part of the
users’
manual, the requested quality will not be achieved
for product water. Usage of such feed water will
cause variation in replacement periods of filters
and membrane.
Inlet pressure is between 3 - 6 bar for water treat-
ment devices without pump and between 1 - 6 bar
for water treatment devices with pump. The opti-
mum working pressure is 3 bar. In case the inlet
pressure is above 4 bar, it is recommended to ins-
tall a pressure reducer to prevent more wastewa-
ter discharge. Do not connect the device to power
socket before it is installed.Our company will not be
liable for any problems caused by non-observance
of the above warnings.
TREATMENT DEVICE FLOW SCHEME
WATER SUPPLY
FAUCET
TANK
1.
2.
3.
4.
PRE-FİLTER
FIRST CARBON
SEDIMENT FILTER / CTO
R.O (50-100 GPD)
5.
6.
7.
8.
SECOND CARBON
RAW WATER
PUMP
WASTEWATER
9.
STORAGE TANK
10.
PRESSURE REDUCER
11.
FAUCET
6
| ENJOY SMART
POINTS TO BE CONSIDERED BEFORE INSTALLATION OF THE DEVICE