CHAPTER 10
42
Post-assembly check
Point 1
Control of delivery
Chapter 1
Did you read the assembly instructions?
Yes
O
No
O
Did you check the delivery for completeness according to the pack list?
Yes
O
No
O
Did you make a visual inspection for transport damages?
Yes
O
No
O
Point 2
Set-up
Chapter 4
Did you weld the base according to the instructions (chapter 4)?
Yes
O
No
O
Did you check the weld seams properly?
Yes
O
No
O
Did you rework the paint after welding?
Yes
O
No
O
Point 3
Crane mounting
Chapter 4
Did you prepare the flat surfaces properly?
Yes
O
No
O
Did you place the crane correctly?
Yes
O
No
O
Did you prepare the screw contact areas correctly?
Yes
O
No
O
Did you tighten up the screws correctly (torques, etc.)?
Yes
O
No
O
Did you re-paint the screws?
Yes
O
No
O
Point 4
Hydraulic system
Chapter 5
Did you ensure CLEANNESS during assembly?
Yes
O
No
O
Did you filter the oil while filling the tank?
Yes
O
No
O
Point 5
Electric system
Chapter 6
Did you connect the power supply correctly?
Yes
O
No
O
Before you activate the fuse for the 24VDC supply, check the power supply.
OK
O
NOK
O
Point 6
Power pack
Chapter 7
Are the chock valves in the pump room open?
Yes
O
No
O
Did you fill the system correctly (up to maximum)?
Yes
O
No
O
Did you use the right oil?
Yes
O
No
O
Summary of Contents for PSM400-16
Page 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Page 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Page 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Page 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Page 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...