MAINTENANCE AND SERVICE
10387 4-9-10-3
2.
Remove the twelve (isolator) bolts securing the roller frame to the drum and isolators.
Using the loader or hoist, lift the frame assembly off of the drum assembly and set
aside. See Figure #1
3.
Use a hoist to finish draining the oil from the roller shaft. Drum removal is complete
DRUM INSTALLATION
1.
Lift the roller frame over the top of the drum assembly and into position. Reinstall the
twelve .50” UNC x 1.25” capscrews and hard flat washers (using loctite 271 or equiva-
lent) securing the frame to the drum.
WARNING! NEVER place hands or fingers between the frame and drum assemblies
during installation or removal. Severe personal injury could occur.
2.
Reinstall the hydraulic motor, gasket and motor guard using the existing hardware (us-
ing loctite 271 or equivalent on motor mounting hardware).
3.
Fill the roller shaft with 80-90 weight gear lube by following the procedure listed in
TO
CHANGE GEAR LUBE.
REPLACING VIBRATION ISOLATORS (RUBBER MOUNTS)
NOTE: Removal of the isolator bolts will allow the vibratory roller frame to fall. Make
sure the frame is completely supported before removing.
WARNING! Follow all mandatory safety shutdown procedures outlined in the loader
operator’s manual before adjusting, cleaning, lubricating or servicing this
attachment.
MOTOR GUARD
REMOVE MOTOR FROM DRUM
ASSEMBLY
DRUM ASSEMBLY
.50” UNC X 1.25 CAPSCREWS
(ISOLATOR BOLTS)
ISOLATOR’S
(RUBBER MOUNTS)
ROLLER FRAME
FIGURE #1
75595
17