6
Step 3: Run the Switch Panel Wires through one of the 3 openings and
then through the rubber grommet found in the parts kit.
Step 4: At this point, use the loom provided to cover the Switch Panel
Wires. Run the loom over the wire, through the grommet, and
into the box. You can secure the end of the loom with a zip-tie.
Note: It isn’t necessary to loom the entire wiring harness as you
will cut these wires to length later. Simply loom a few feet and
make sure the end inside the base is secure.