3-12
Machine Maintenance Procedures
ODD (Optical Disk Drive) Module Removal
0
Prerequisite:
Battery Pack Removal
1.
Remove one (1) screw (A) from lower cover. (Figure 3-7)
Figure 3-7.
ODD Module in Lower Cover
2.
Remove ODD module (B) from ODD bay. (Figure 3-7)
3.
Remove two (2) screws (C) from ODD module. (Figure 3-8)
4.
Remove ODD bracket (D) from ODD module.
5.
Remove ODD bezel (E) from ODD module.
Figure 3-8.
ODD Module
A
B
C
C
E
D
Summary of Contents for EasyNote TK11BZ
Page 1: ...Packard Bell EasyNote TK11BZ TK13BZ SERVICEGUIDE ...
Page 4: ...iv ...
Page 10: ...x ...
Page 11: ...CHAPTER 1 Hardware Specifications ...
Page 14: ...1 4 ...
Page 53: ...CHAPTER 2 System Utilities ...
Page 80: ...2 28 System Utilities ...
Page 81: ...CHAPTER 3 Machine Maintenance Procedures ...
Page 84: ...3 4 ...
Page 118: ...3 38 Machine Maintenance Procedures ID Size Quantity Screw Type B ICW50 CPU Thermal Screw 4 ...
Page 135: ...CHAPTER 4 Troubleshooting ...
Page 162: ...4 28 Troubleshooting ...
Page 163: ...CHAPTER 5 Jumper and Connector Locations ...
Page 172: ...5 10 Jumper and Connector Locations ...
Page 173: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Page 174: ...6 2 Exploded Diagrams 6 4 FRU List 6 6 Screw List 6 21 ...
Page 194: ...6 22 FRU Field Replaceable Unit List ...
Page 195: ...CHAPTER 7 Model Definition and Configuration ...
Page 196: ...7 2 Packard Bell EasyNote TK11BZ TK13BZ 7 3 ...
Page 200: ...7 6 Model Definition and Configuration ...
Page 201: ...CHAPTER 8 Test Compatible Components ...
Page 202: ...8 2 Microsoft Windows 7 Environment Test 8 4 ...
Page 213: ...CHAPTER 9 Online Support Information ...
Page 214: ...9 2 Introduction 9 3 ...
Page 216: ...9 4 Online Support Information ...