Installation Instructions
Procedure:
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE
MAINTAINED.
The services of a competent or certified installer, (certified by the Wood Energy Technical Training program (WETT) - in
Canada, Hearth Education Foundation (HEARTH) - in U.S.A.,) are strongly recommended.
Note: See "Combustion Air" on page 18
1. Position stove and floor protection with hole for combustion air in accordance with the clearances as stated on the
label and in Figure 8.
2. Mark the position for the hole in the ceiling and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with floor joists, ceiling joists or rafters before proceeding further.
4. Cut a hole in the ceiling and roof to suit the chimney system and frame in the sides. The chimney support is mounted
to the framing.
5. If the chimney connector exits the mobile home less then 7 feet above the ground then a guard must be installed to
cover the connector up to a height of 7 feet (2.13m).
6. The guard must not have opening larger than 3/8"(10mm) and must maintain a space of 4"(102mm) minimum around
the chimney connector.
7. Assemble chimney sections so the finished length is resting on the support and protruding through the roof. Avoid
having joints between ceiling and roof. Install radiation shield. Assemble flashing and storm collar and be sure to
maintain the vapour barrier at this point. (Seal securely.) Attach rain cap and check flashing for leaks.
8. Install connector as per manufacturer's instructions.
9. Attach stove to flooring using two 1/4" x 2" or longer lag screws.