System Operations Manual
www.paceworldwide.com
Page 25 of 40
i. Load PCB and align component with red laser light roughly in the center
of the component.
ii. Click on Load PCB button.
iii. Click on the Lower Heater Arm button.
iv. Position board and component to be removed so the nozzle will fit
exactly down over the component without contacting the component.
v. Click on the Align component button. Adjust the nozzle fluxh with the
PCB using the up and down arrows.
vi. Click on Lower Nozzle button.
vii. Click Start button to begin profile.
7. Temperature
Control
a. Heater temperatures are adjusted by changing the numbers on the profile screen
by clicking on the arrows, moving the temperature bars or using the up and down
arrows on the keyboard. (See paragraph 6.c.ii.)
8.
Available Nozzles/Accessories/Optional Items
a. A complete list of nozzles and accessories is on our web site,
paceworldwide.com
9. Maintenance
Caution: Disconnect the main power supply and computer cables before
opening the TF 1500 door, replacing any component or before performing any
routine maintenance.
a. Cleaning the Blower Filter. Clean the filter every three months.
i. Open the cover on the back of the TF 1500. (Figure 21)
ii. Identify the blower pump, mounted on the base of the machine.
iii. Loosen the screw fitted to the end of the filter housing.
iv. Remove the housing, then the filter.
v. Clean the filter using warm water.
vi. Make sure the filter is dry before reassembly.
Figure 21
pump filter housing
screw