![Pace TF 1500 BGA Operation And Maintenance Manual Download Page 20](http://html1.mh-extra.com/html/pace/tf-1500-bga/tf-1500-bga_operation-and-maintenance-manual_3142878020.webp)
System Operations Manual
www.paceworldwide.com
Page 20 of 40
Figure 15
vi.
Position the board so the red laser sighting light is roughly in the center
of the placement site. To move the board forward and back simply
move the PCB in the arms. To move the assembly left and right push
the release handle away from you and move the assembly. Pull the
release handle towards you to secure the assembly.
vii.
Pull the camera out. (Figure 16)
Figure 16
viii.
Mouse click on the green button.
ix.
Place the component in the mounting plate on top of the camera
housing. (Figure 17a) The component needs to be oriented the same
as the nozzle. Adjust per paragraph 11.
Retention Screw
Release Handle