Contents
1
Preface
1.1
1.1.1
1.1.2
1.2
About the document
Structure of this document
How to use the documentation
Target groups
4
4
4
4
4
2
Introduction
2.1
2.2
2.2.1
2.2.2
2.2.3
Site layout considerations
Floorplan
Block configuration
Line configuration
Cable gland plate
5
6
7
8
8
9
3
Civil work
3.1
3.2
The foundation
Ventilation
10
11
12
4
Mechanical installation
4.1
4.2
4.3
Preparation
Use a forklift to transport the charger
Remove the charger cabinet from the pallet
13
14
14
15
5
Electrical installation
5.1
5.1.1
5.1.2
5.1.3
5.2
5.3
5.4
5.4.1
5.4.2
5.4.3
5.4.4
5.5
5.6
Electrical power connection
Ac configuration
Grounding instructions
Preparation
Install the cable lugs and the shrink sleeves
Connect the ac power supply cables
Connect the output connections
Output terminal connections
Interconnection between cabinets
Output terminal wiring
Dc-connections
After installation checks
Evse preconditioning
16
16
17
17
17
17
18
18
19
20
20
21
21
22