Note:
After installation the EVSE must be preconditioned to comply to the climatic
specifications.
Note:
Between the FAT and the SAT of the system, the installer is responsible and liable for
complying to the climatic specifications.
When not stored, the EVSE system must always be (pre)conditioned. The EVSE (and separate DC
outlet cabinets) are prepared for climate (pre)conditioning.
Preconditioning:
1. Connect a temporary or the incoming AC cable to L1/L2/L3.
2. Set first service switch off for each
of the base product cabinets
3. Then turn auxiliary circuit breaker on for
each of the base product cabinets.
4. Close cabinets (EVSE and all connected DC outlets).
5. Preconditioning will take place automatically as
long as supply voltage is provided
EVSE preconditioning
5.6
Warning:
If a temporary (removable) or alternative ac power supply is used instead of the
permanent ac power supply intended for use with the charger, the ac supply must
be able to provide sufficient power for the connected evse and dc outlets in this
system. Additionally it must be
protected against residual-
(<30ma) and overcurrent at the
feeding side of the cable.
22